ACB Expands Facility

Monday, July 30, 2007
ACB has signed a Letter of Intent (LOI) with Jansen Inc. to have a new manufacturing facility built in Ferndale, Wash. Jansen Inc. will provide ACB with 190,000 sq. ft. manufacturing facility plus a separate 10,000 sq ft. general office building on the I-5 Industrial Center property in Ferndale. The new facility will allow ACB to increase their annual production capacity to 400 boats to meet the current and future demands of their growing recreational, commercial, and government contracts.

As part of their expansion plans, ACB is in the process of executing a new lease for an additional 12,000 square. feet in Fairhaven from the Port of Bellingham. With the additional space, ACB will occupy about 72,000 square feet at the Port’s Fairhaven Marine Industrial Park.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

QinetiQ Signs Contract with ASV

QinetiQ, as part of a new Marine Surface Target Service, has signed a contract with Autonomous Surface Vehicles (ASV) for the supply and operational support of autonomous surface target vessels.

GTT Wins DSME Order for 9 More Icebreaking LNGCs

Gaztransport & Technigaz (GTT), a designer of membrane containment systems for the maritime transportation and storage of Liquefied Natural Gas (LNG), announced

Bollinger to Build 6 More FRCs for the USCG

Bollinger Shipyards, Inc., Lockport, Louisiana, announced the award of six additional USCG Sentinel Class Fast Response Cutters (FRCs). The U. S. Coast Guard

News

House Subcommittee Hearing Highlights “Dismal State” of U.S. Icebreaking Capability

At the July 23, 2014, hearing of the House Subcommittee on Coast Guard and Maritime Transportation on “Implementing U.S. Policy in the Arctic” the committee chairman, Rep.

Iraqi Kurdish Oil Nears US Port Despite Concern in Washington

A tanker carrying crude oil from Iraqi Kurdistan is just two days away from arriving at a U.S. port, according to ship tracking satellites, despite Washington's

Phillips 66 Marine Fueling Facility Nears Completion

Phillips 66’s previously announced marine over-the-water fueling facility at its Richmond, Calif. terminal is nearing completion. The facility, located on Canal Boulevard, and known as Pier No.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1322 sec (8 req/sec)