Voith Wins Landmark PSV Contract

Tuesday, June 14, 2005
Norwegian shipowner Østensjø Rederi AS has placed an order with Voith Turbo Marine for two Voith Schneider Propellers (VSP) for a Platform Supply Vessel (PSV), a landmark order for the propulsion manufacturer as this is its first application on this vessel type. Designed by Norway’s Skipsteknis, the vessel will be built in Spain at Astilleros Gondan shipyard.

The PSV is scheduled to begin working in the beginning of 2007. The PSV will be Dynamic Positioning (DP II) capable. According to the propulsion manufacturer, a PSV driven by two VSPs requires 10 to 20 percent less power, depending on the load conditions and the sailing speed, helping to save fuel and reduce maintenance.

First model test series were carried out at Marintek in Trondheim, Norway, in February 2002. In the first test series, the power uptake of the two propulsion elements ‘contra-rotating propeller’ (CRP) and ‘VSP’ was established. Here, the VSP needed approximately 10 percent less power at various hull drafts and across the entire speed range. The second model test series at SVA in Vienna in February 2005, a test which reportedly confirmed that the R&D team had taken the correct path.

A special feature of the VSP is its roll damping capacity. At standstill and when not in full sail, the VSPs can be used to reduce the effects of high seas on the ship. This is particularly important, since PSVs are loaded and unloaded on the high seas. In such a situation, a rolling vessel would slow down the loading process or stop it altogether. The VSP in combination with the Voith Roll Stabilization (VSR) reduces this risk.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Shell Commited To Russia Expansion Despite Sanctions

Royal Dutch Shell is committed to expansion in Russia, Chief Executive Ben van Beurden told Russian President Vladimir Putin at a meeting on Friday amid sanctions

Russia Ships First Oil From Offshore Arctic Platform

President Vladimir Putin hailed Russia's first shipment of Arctic offshore oil on Friday, saying the platform decried by environmentalists will help Moscow expand its global energy markets share.

When Will Deep Sea Mining Commence? The Robot is Ready

The world's first deep sea mining robot sits idle on a British factory floor, waiting to claw up high grade copper and gold from the seabed off Papua New Guinea

Environmental

Years After BP U.S.Oil Spill: Compensation Battle Rages

Four years after the Deepwater Horizon spill, oil is still washing up on the long sandy beaches of Grand Isle, Louisiana, and some islanders are fed up with hearing from BP that the crisis is over.

When Will Deep Sea Mining Commence? The Robot is Ready

The world's first deep sea mining robot sits idle on a British factory floor, waiting to claw up high grade copper and gold from the seabed off Papua New Guinea

Canaveral Tops State List for Sand Bypass Funding

The Canaveral Harbor Inlet Sand Bypass Project has earned the top state ranking for 2014/15 inlet management funding. As a result, Port Canaveral is expected to receive $100,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Pipelines Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1223 sec (8 req/sec)