Aker Yards to Build Container Vessels for König & Cie

Friday, February 25, 2005
Aker Ostsee in Germany, a part of Aker Yards, has been awarded contracts to build four container vessels of the type Aker CS 2700 for König & Cie. GmbH & Co. KG in Hamburg (Germany). The total contract value is approximately EUR 160 million. The vessels are due for delivery between the first and third quarter of 2007. The vessels of the type Aker CS 2700 are 221.6 m long and 29.8 m wide, with a deadweight of 37.570 t. They have a total container stowage capacity of 2,741 TEU with 400 reefer sockets for FEU. With a main engine (2-stroke) output of 20,580 kW, these vessels have a service speed of 22 kn. The order reserve of the combined Aker Ostsee shipyards in Wismar and Rostock-Warnenmünde with a total of appr. 2,250 employees and appr. 120 apprentices (1st February 2005) comprises 25 container vessels with 2,500 and 2,700 TEU respectively with last delivery in the third quarter of 2007.
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Container Ships

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Container Ship breaks Down off Essex Coast

Lifeboats from Walton and Frinton, and the Harwich have been called out to a container ship ANL Warringa off the coast of Essex which had been reported to be drifting in a major shipping lane.

Mediterranean Rescue Operations Strain Shipping

The Wall Street Journal ran a story yesterday describing how the increasing number of seaborne migrants making the journey from Africa to Europe has not only

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

 
 
Maritime Contracts Maritime Security Navigation Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1238 sec (8 req/sec)