Northrop Grumman Awarded $257 Million Contract

Monday, February 14, 2005
Northrop Grumman Corporation has been awarded a $257 million contract from the U.S. Navy for work on the aircraft carrier USS George Washington (CVN 73). This work follows more than a year of advance planning efforts conducted under the contract awarded in Dec. 2003. Northrop Grumman's Newport News sector is the prime contractor for this award. "We've worked closely with the Navy and Navy shipyards during the planning stage of this project to develop best practices that will help us now as we begin the maintenance period," said Bob Gunter, senior vice president of the Aircraft Carrier Program at Northrop Grumman Newport News. "This collaboration has laid the groundwork for a successful partnership and a successful availability." The George Washington arrived at the Newport News shipyard on Jan. 27 for a 10-and-a-half month maintenance availability, which will include dry-docking for approximately seven months. Work will include repair and refurbishment of the hull, sea chests, shafting, propellers and rudders; blasting and coating of numerous tanks; modernization of spaces to support the F/A-18 Super Hornet aircraft equipment and weapons stowage systems; enhancements to crew living areas; scheduled maintenance on propulsion plant systems and repair and inspections on a variety of ship systems. Launched in 1990 and delivered to the Navy in 1992, the George Washington is the sixth nuclear-powered Nimitz-class aircraft carrier built by Northrop Grumman Newport News. At 1,092 feet, with a flight deck width of 252 feet and a displacement of 97,000 tons, the George Washington can travel in excess of 30 knots. This is the first time the ship has returned to the Newport News shipyard since it was delivered more than 12 years ago.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Chevron Suffers Loss, Plans Job Cuts

Chevron Corp. reported a first-quarter loss as slumping oil prices continued to drag down revenue. The company said that it is "on target" to lay off a total of 8000 workers by the end of 2016,

China COSCO to be First through the Expanded Panama Canal

China COSCO Shipping has won the draw for its container vessel Andronikos to make the ceremonial first transit through the Expanded Panama Canal during the waterway’s inauguration on Sunday, June 26.

Sellick Equipment to Open New Facility

On April, 20, 2016, at the young age of 97 years, Walter Sellick along with sons Howard Sellick - President, David Sellick - Vice President and grandson Colin Sellick - Systems Manager,

Navy

Canadian Navy Frigate Refit Program Completed

Seaspan joined Harjit S. Sajjan, Canada’s Minister of National Defense, at an official ceremony today to celebrate the completion of the Halifax-Class Modernization/Frigate

This Day In Naval History: April 29

1814 - American sloop USS Peacock and HMS Epervier engage in battle. Peacock takes two 32-pound shots in her fore-yard with the first exchange, but her return broadside

How France Sank Japan's Sub Dream

Ousting of Japan ally PM Abbott opened door to rivals; Tokyo slow to respond to new competitive process. In 2014, a blossoming friendship between Australian

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0919 sec (11 req/sec)