Aker Kvaerner Secures Contract from BP

Monday, January 31, 2005
AK Engineering Services, part of the Aker Kvaerner group, has secured a multi-million pound contract to service two major onshore facilities for BP in the UK. The work will be performed by personnel from the firm's Stockton facility and from sister organisations in Aberdeen and Solent over the next three years. The scope of work covers the provision of engineering, modifications and maintenance services at BP's Wytch Farm production and transport facility in Dorset, and at the BP CATS (Central Area Transmission System) gas terminal on Teesside, North East England. The contract includes three further two-year extension options. Around 150 personnel from the three locations will be employed on the project. The new contract is the second to be awarded by BP to the Aker Kvaerner group in recent weeks. The first involves engineering, procurement services and construction management services for projects at several BP sites in Germany, work that is being carried out by Aker Kvaerner's European operations. Jarle Tautra, Executive Vice President for the firm's European E&C business area, says the latest contract is cause for great celebration: "We are delighted to be working with BP in the UK, which will enable us to consolidate the relationship we are building with BP in Germany. This project represents a major opportunity for the teams at our various locations to create a flagship contract that will deliver total life-cycle engineering services to both the CATS and Wytch Farm facilities." In operation since 1993, the CATS terminal receives and processes natural gas from the central UK Sector in the North Sea via a 400-kilometre pipeline system, which, in 2002, transported 1.7 billion cubic feet of gas a day to Teesside. The Wytch Farm development has been producing oil and gas since 1979. The oilfield lies a mile beneath the surface of Poole Harbour in Dorset, on the south coast of England, a designated Area of Outstanding Natural Beauty. The field is being developed by extended reach drilling from an onshore site, concealed from public view, to ensure minimum impact on the environment.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Joint Petroleum Development in South China Sea Makes Sense

Shared development of oil, gas and possibly other natural resources is the most promising option for reducing tensions in the South China Sea and should be the

Tugboat Capsizes Near 106th Bridge, Chicago

The Coast Guard informs it is responding to the capsize of a tug on the Calumet River near the 106th St. Bridge in Chicago, in which the two crew members were able

Oceanteam Focuses on Mexico Strategy

Oceanteam Shipping ASA releases its Q2 2014 financial report, with extracts as follows: The company says it saw, with its early focus on Mexico, a long term

Offshore

Joint Petroleum Development in South China Sea Makes Sense

Shared development of oil, gas and possibly other natural resources is the most promising option for reducing tensions in the South China Sea and should be the

Oceanteam Focuses on Mexico Strategy

Oceanteam Shipping ASA releases its Q2 2014 financial report, with extracts as follows: The company says it saw, with its early focus on Mexico, a long term

Wärtsilä Signs Harvey Gulf OSV Maintenance Agreement

Wärtsilä says it has signed a long-term Technical Management Agreement with Harvey Gulf International Marine LLC (Harvey Gulf). This five-year agreement covers

 
 
Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1622 sec (6 req/sec)