ACMA, VT Halter Awarded NOAA Contract

Wednesday, November 10, 2004
Alan C. McClure Associates (ACMA) said that the National Oceanic and Atmospheric Administration (NOAA) awarded ACMA and VT Halter Marine Phase II of a three-part contract that calls for the design, development and construction of a new Small Waterplane Area Twin Hull (SWATH) coastal mapping vessel (CMV).

Initially, NOAA awarded two teams the chance to participate in the first phase of the project. ACMA and VT Halter Marine were one of the two teams that qualified for Phase I, a stage that lasted four months and consisted of Feasibility Analysis and Preliminary Design contracts. Phase II will entail the Contract Design and is expected to wrap up around May of 2005. At that time, NOAA will decide whether to proceed with the last phase of the program which will be the Detail Design and Construction of the NOAA SWATH CMV. The primary mission of the ship will be to conduct full seafloor mapping of coastal areas. Doug Ottens, principal marine engineer with ACMA, explained the significance in terms of US National Security, “In mapping the U.S. coastal seafloor, we will be able to monitor discrete changes and detect any potential intruders.”

Ottens went on to note that operations will be conducted continuously 24 hours a day and that the mission will be accomplished by:

· Conducting basic hydrographic surveys via full seafloor ensonification

· Periodic navigational area clearance of fairways and approaches to ports

· Diver or small boat resolution of individual significant items deemed hazardous to surface navigation

· Conducting research in support of nautical charting and seafloor mapping

“ACMA is known for cost-effective design and mission flexibility,” said ACMA President Scott McClure. “Add that to our unrivaled experience in SWATH development, and our capabilities are a perfect match for this assignment. Should NOAA decide to move forward in 2005 with the detail design and construction of the NOAA SWATH CMV, ACMA and VT Halter Marine look forward to being the team that completes the final phase of this assignment.”

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

Danish Pleasure Craft Safety Board Gets A New Head

From 1 February 2015 a new chairman will head the Danish Pleasure Craft Safety Board. The new incumbent is Jan Thorn, who is in his everyday work Director

MSC Sinfonia Upgradation at Fincantieri Shipyard

Extension operations on MSC Sinfonia, the second out of four MSC cruise ships to undergo the Renaissance Programme of enhancements, have begunin the past days at Fincantieri shipyard in Palermo.

Carnival Cruise Line Returns to Europe

Carnival Cruise Lines is to return to Europe next year with its biggest ship ever, the 3,936-passenger Carnival Vista.  The Doral-based cruise line revealed details about the new 133,500-ton vessel.

Vessels

Danish Pleasure Craft Safety Board Gets A New Head

From 1 February 2015 a new chairman will head the Danish Pleasure Craft Safety Board. The new incumbent is Jan Thorn, who is in his everyday work Director

Collision With lock Gate in Kiel Canal

Delays can be expected in the Kiel Canal following a collision this yesterday, 23 January, with the small north lock gate at Brunsbuettel. Only the big north

MSC Sinfonia Upgradation at Fincantieri Shipyard

Extension operations on MSC Sinfonia, the second out of four MSC cruise ships to undergo the Renaissance Programme of enhancements, have begunin the past days at Fincantieri shipyard in Palermo.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1193 sec (8 req/sec)