ACMA, VT Halter Awarded NOAA Contract

Wednesday, November 10, 2004
Alan C. McClure Associates (ACMA) said that the National Oceanic and Atmospheric Administration (NOAA) awarded ACMA and VT Halter Marine Phase II of a three-part contract that calls for the design, development and construction of a new Small Waterplane Area Twin Hull (SWATH) coastal mapping vessel (CMV).

Initially, NOAA awarded two teams the chance to participate in the first phase of the project. ACMA and VT Halter Marine were one of the two teams that qualified for Phase I, a stage that lasted four months and consisted of Feasibility Analysis and Preliminary Design contracts. Phase II will entail the Contract Design and is expected to wrap up around May of 2005. At that time, NOAA will decide whether to proceed with the last phase of the program which will be the Detail Design and Construction of the NOAA SWATH CMV. The primary mission of the ship will be to conduct full seafloor mapping of coastal areas. Doug Ottens, principal marine engineer with ACMA, explained the significance in terms of US National Security, “In mapping the U.S. coastal seafloor, we will be able to monitor discrete changes and detect any potential intruders.”

Ottens went on to note that operations will be conducted continuously 24 hours a day and that the mission will be accomplished by:

· Conducting basic hydrographic surveys via full seafloor ensonification

· Periodic navigational area clearance of fairways and approaches to ports

· Diver or small boat resolution of individual significant items deemed hazardous to surface navigation

· Conducting research in support of nautical charting and seafloor mapping

“ACMA is known for cost-effective design and mission flexibility,” said ACMA President Scott McClure. “Add that to our unrivaled experience in SWATH development, and our capabilities are a perfect match for this assignment. Should NOAA decide to move forward in 2005 with the detail design and construction of the NOAA SWATH CMV, ACMA and VT Halter Marine look forward to being the team that completes the final phase of this assignment.”

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

Survitec Escape Slide Chosen for Norwegian Ferry

The all-electric Zero Cat ferry, currently under construction at the Fjellstrand yard in Norway, will enter service next year with Norled as the first Norwegian

Alaskan Ferry Repower Completed

Elliott Bay Design Group (EBDG), a naval architecture and marine engineering firm with offices in Seattle, New Orleans and Ketchikan, Alaska, today announced the

Libyan Boat Sinks: Perhaps Plus 250 Lost

More than 250 migrants may have died when a boat sank a kilometre (half a mile) off the Libyan coast, a coastguard official said on Sunday. "We believe there

Vessels

First N.American Boat Powered by Volvo Penta IPS

Thomas Paine, the new 50-ft. aluminum patrol boat that joined the Massachusetts Environmental Police fleet in July, is the first commercial vessel in North America

Report: Ports Lack Maintenance Support

The latest Barometer Report from Trelleborg has revealed a huge gap in the maintenance requirements of port owners and operators, and the support that suppliers are able to provide.

Brazilian PSVs Get Rolls-Royce Offshore Cranes

Rolls-Royce signed a contract with Detroit Chile SA to supply offshore cranes to nine Platform Supply Vessels (PSVs) presently under construction at Detroit Brasil Ltda.

 
 
Maritime Contracts Maritime Standards Navigation Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1228 sec (8 req/sec)