NASSCO Starts Second T-AKE Ship

Monday, October 11, 2004

National Steel and Shipbuilding Company (NASSCO) has begun construction on the second ship in the T-AKE program, a new class of combat logistics force ships designated the Lewis and Clark class. Mrs. DeAnne Sutton, wife of U.S. Navy Commander George Sutton of the NAVSEA Program Office, made the first cut on the ship's first steel plate to signify the start of construction. The U.S. Navy has awarded NASSCO contracts for six new dry cargo/ammunition ships for a total contract value of $1.87 billion. The T-AKE contract includes options for an additional six ships, eventually creating a 12-ship fleet of new combat logistics force ships. If all the options are exercised, the 12-ship program would have a total value of $3.7 billion and become the largest contract in NASSCO's history. The first T-AKE, which has been under construction at NASSCO for a year, will be named the Lewis and Clark. This ship, the second T-AKE, is to be named the Sacagawea in honor of the Shoshone Indian woman who acted as guide and interpreter for Lewis and Clark on their expedition into the Northwest region of the United States from 1804-1806.

The T-AKEs will be 210 m (689 ft.) in length and 32.2 meters (105.6 ft.) in beam, with a design draft of 9.12 m (29.9 ft.). The ships will carry almost 7,000 metric tons of dry cargo and ammunition and 23,500 barrels of marine diesel fuel. First Offshore LNG

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Bollinger Appoints Sales VP

Bollinger Shipyards announces the promotion of Eric Bollinger to Vice President of Sales.   President and CEO Ben Bordelon made the announcement, stating, “Eric

Lamprell to Implement Software for Automated Manufacturing

U.A.E based offshore jackup rig builder Lamprell Energy Ltd., will implement SSI's EnterprisePlatform software solution to allow its engineering team to automate manufacturing processes.

Bids Placed for Novy Port Icebreaker Contract

Seven companies submit bids for contract for Yamal Novy Port terminal icebreaker   The tendering process for the Yamal Novy Port terminal icebreaker design and build contract has kicked off,

Offshore

Five Years on from Macondo

An interview with NOIA’s Randall Luthi provides unique perspective on where the offshore energy business has been, where it is now, and where it could be headed next.

Offshore O&G: Weathering the Storm

Vessels are stacked as Gulf oil operators retrench and day rates fall. In the Gulf of Mexico, vessels serving offshore oil-and-gas exploration and production are

Fugro Extends Contract with McDermott

Fugro has been awarded a three-year extension to its existing contracts with McDermott Middle East, Inc. The contract covers the provision of survey, positioning,

 
 
Maritime Careers / Shipboard Positions Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1517 sec (7 req/sec)