New Costwise ATB Design from Ocean Tug & Barge Engineering

Wednesday, September 08, 2004

Claiming "an advancement in the art of tug and barge design," Ocean Tug & Barge Engineering (OT&B), Milford, Conn., has introduced a new ATB design "based on the firm's long experience and highly successful specialization in this market," said OT&BE President Robert Hill. The company's Costwise AT/B series are targeted to attain higher unit speeds at sea, better maneuverability and improvements in habitability, constructability and ergonomics. "The Costwise AT/B design will be adaptable to the broader, worldwide market, while still meeting the unique design requirements of the U.S. market," Hill said. The company says it has had a hand either in the design or refit engineering of over one-half of the ATBs operation in the United States. The new designs are adaptable to the full line of connection systems such as Intercon, Bludworth/FPS, Articouple, JAK and Push/Pin. The range of DWT capacities ranges from 2,400 to 18,000 and vessel speeds up to 14 knots. The first vessels to be built will be a multivessel program to be based outside of the U.S. This new design was develop in association with CT Marine, Edgecomb, Maine and Taisei Engineering of Tokyo, Japan.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Seacor Takes Delivery of 10,800 HP Crewboat

Seacor Marine is building ever larger and more powerful mono-hull crew/supply boats. The first of these to be delivered is the 202x34-foot Alex F. McCall with some very impressive statistics.

A Classic Repower

The tug Falcon was built by Modern Marine Inc. in 1978. In the intervening years, companies that employed her have changed hands a number of times until 2013 when Vane Line Bunkering of Baltimore,

The Legal Consequences of 46 CFR Subchapter “M”

As the holiday season and the end of another year quickly approaches, the towing industry patiently waits for the Coast Guard to finalize the long-awaited towing vessel inspection rule.

Finance

New Company Takes Over OW Tanker

OW Tanker, a unit of bankrupt OW Bunker and owner of its marine fuel supply ships, has been taken over by a newly-created company, the fleet manager told Reuters on Wednesday.

WRRDA: Clearing the Channel for P3 Projects

A Creative Combination for Financing Inland Waterways Infrastructure Earlier this year, the U.S. maritime industry in general, and the inland waterways industry in particular,

Choosing the Best Financing Proposal

It isn’t always about the rate. In a robust boatbuilding market – like the one we see now – even the most successful, financially stable operators need to borrow.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1975 sec (5 req/sec)