Austal, Raytheon Team for $2B Ship Bid

Monday, August 30, 2004
Austal Limited teamed with Raytheon Australia to bid for the upcoming Australian Government tender to build two amphibious ships, which is due to be issued in early 2005. “By combining Austal’s impressive track record of on time, on budget shipbuilding with Raytheon's expertise in electronic systems, we have created a powerful team to build and support the new amphibious vessels, along with considerable potential to bid for other naval contracts in the future,” said Austal’s Managing Director, Mr Bob McKinnon. The amphibious vessel project has an indicative cost of $1.5 to $2 billion. The preferred tenderer is likely to be identified by late 2005, with in-service delivery planned between 2010 and 2014.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

OSI to Integrate Software for UK Royal Navy

OSI Maritime Systems (OSI) announced the signing of a contract to integrate its flagship software, ECPINS-W Sub, into the U.K. Royal Navy’s T45 Destroyer Integrated Bridge System (IBS).

HHI to Deploy 3DEXPERIENCE Design Platform

Hyundai Heavy Industries Selects Marine & Offshore Industry Solution Experiences for Design and Engineering of Offshore Structures Dassault Systèmes, the 3DEXPERIENCE Company,

Canadian Icebreaker Refit Contracts Awarded

The Canadian Government informs it has awarded a $6.5 million contract to Babcock Canada Inc. for critical refit work for Canadian Coast Guard ship 'CCGS Louis S.

Offshore

Coast Guard groundbreaking ceremony recogizes new support facility

Representatives from the 14th Coast Guard District, Coast Guard Base Honolulu and Mortenson Federal Contracting Group participated in a groundbreaking ceremony

Diamond Offshore Shares on the Rise

Diamond Offshore Drilling Inc, one of the world's top five offshore rig contractors, reported a better-than-expected quarterly profit as it cut drilling costs and hiked prices,

Offshore O&G: Cuts, Delays in Norway as Costs Soar

More oil and gas projects in Norway could be put on hold because of rising costs, adding to a growing list of developments that have been delayed or called off,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1143 sec (9 req/sec)