MODEC Awarded TLP for Anadarko Field

Tuesday, February 05, 2002
MODEC International LLC has entered into a letter of intent with El Paso Energy Partners, L.P. for the engineering, procurement and construction of the hull, mooring and production riser system for the world’s deepest tension leg platform (TLP). The TLP is expected to be owned by EPN and Cal Dive International, Inc. and is planned to serve as a production hub at Green Canyon 608 in the Gulf of Mexico initially for Anadarko Petroleum Corporation’s Marco Polo field discovery. The TLP is planned to be installed in 4,300 feet of water and is capable of supporting processing equipment designed to process 100,000 barrels of oil per day and 250 million cubic feet of natural gas per day. The facilities are scheduled to be online in 2004.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Gulf of Mexico Oil Production on the Rise

Because of the long timelines associated with Gulf of Mexico (GOM) projects, the recent downturn in oil prices is expected to have minimal direct impact on GOM crude oil production through 2016.

Ferguson Appoints Partner OPS-OES

Ferguson Group Singapore, a specialist in the provision of DNV 2.7-1 / EN12079 offshore containers, reefers, tanks, waste skips, baskets, accommodation and engineering

Nabors Posts Quarterly Loss as Drilling Activity Slows

Offshore driller Nabors Industries Ltd reported a quarterly loss, hurt by lower drilling activity amid a slump in global crude prices.   The company posted a net loss of $891.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pipelines Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2593 sec (4 req/sec)