Oil Spill Clean-up Continues in Texas

Monday, August 09, 2004
The Coast Guard established a safety zone on the Neches River from just north of the DuPont plant to the Veteran’s bridge.

No recreational boaters will be allowed into the safety zone until more of the oil has been removed. Both the Coast Guard and Texas Parks and Wildlife Department will be patrolling the area to ensure that recreational boaters observe the parameters set by the safety zone.

Since the Neches River’s opening at approximately 11:44 a.m. Wednesday, a significant amount of ship and barge traffic has been allowed to move in and out of port. As of 4 p.m. today, ship and barge traffic is largely back to normal with the exception of nine ships and barges that must be washed down before heading into uncontaminated water. Crews will work throughout the night to de-oil these vessels and prepare them to sail.

Port Neches park boat ramp and waterfront will remain temporarily closed to continue launching resources aiding in the clean up effort. The park remains open, however people are urged to use caution when visiting the park, as there is still a lot of activity with response personnel and vehicles moving in and out of the area.

As river clean up continues, the costs rise. The latest figures from the unified command put the cost at just over $2 million.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Maritime Reporter @ 75: The Daily Cartoon

Maritime Reporter & Engineering News was founded by John J. O'Malley (1905-1980) in 1939, and today ranks as the world's largest audited trade publication in the world serving the maritime industry,

MN 100: Horizon Shipbuilding, Inc.

13980 Shell Belt Road Bayou La Batre, AL 36509 E-mail: trshort@horizonshipbuilding.com Website: www.horizonshipbuilding.com President and General Manager: Travis R.

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

Environmental

BMT WBM to Showcase TUFLOW at World Bank Seminar

BMT WBM ( (BMT), a subsidiary of BMT Group Ltd, a leading international engineering and risk management consultancy, is delighted to announce that it will be presenting

Long Beach Cargo Operations Resume

Repair work begins after storm surges subsides The Port of Long Beach resumed full cargo-handling operations Thursday, Aug. 28, after a lessening of storm surges

Restoring the NY-NJ Harbor Estuary

Significant challenges often require a team effort. Restoring the New York-New Jersey Harbor Estuary is one of them. A group of professionals from the Army Corps of Engineers,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1575 sec (6 req/sec)