Oil Spill Clean-up Continues in Texas

Monday, August 09, 2004
The Coast Guard established a safety zone on the Neches River from just north of the DuPont plant to the Veteran’s bridge.

No recreational boaters will be allowed into the safety zone until more of the oil has been removed. Both the Coast Guard and Texas Parks and Wildlife Department will be patrolling the area to ensure that recreational boaters observe the parameters set by the safety zone.

Since the Neches River’s opening at approximately 11:44 a.m. Wednesday, a significant amount of ship and barge traffic has been allowed to move in and out of port. As of 4 p.m. today, ship and barge traffic is largely back to normal with the exception of nine ships and barges that must be washed down before heading into uncontaminated water. Crews will work throughout the night to de-oil these vessels and prepare them to sail.

Port Neches park boat ramp and waterfront will remain temporarily closed to continue launching resources aiding in the clean up effort. The park remains open, however people are urged to use caution when visiting the park, as there is still a lot of activity with response personnel and vehicles moving in and out of the area.

As river clean up continues, the costs rise. The latest figures from the unified command put the cost at just over $2 million.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

The Art of Propeller Making

The world’s biggest propellers have their cradle in the North of Germany. MMG – Mecklenburger Metallguss GmbH – has manufactured for more than 65 years propellers for ships,

USACE Barges, Tugs Up for Repair

The United States Army Corps of Engineers (USACE) Buffalo District has awarded a repair contract to Great Lakes Shipyard for two tugs and two barges from the Corps’ Cleveland Field Station.

Signal Ship Repair Achieves OSHA Milestone

Signal International announced that on December 31, 2014, the Signal Ship Repair Operations located in Mobile, Alabama achieved one full year and worked 387,926 manhours,

Environmental

Ecochlor BWTS Chosen for 8 New Bulkers

Times Navigation, Inc. has selected Ecochlor, Inc. to provide ballast water treatment systems (BWTS) for installation on a fleet of eight new CROWN63 (63,500 DWT)

Signal Ship Repair Achieves OSHA Milestone

Signal International announced that on December 31, 2014, the Signal Ship Repair Operations located in Mobile, Alabama achieved one full year and worked 387,926 manhours,

International Sulphur Campaign Launched

An international information campaign on the new, stricter sulphur requirements and their enforcement will be launched in February and, at the same time, cooperation

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1203 sec (8 req/sec)