Rates for U.S. pilotage on the Great Lakes

Monday, December 15, 2003
The U.S. Coast Guard issued an interim rule providing a partial rate adjustment for U.S. pilotage on the Great Lakes. This interim action is being taken while the agency completes its evaluation of issues raised in response to its proposed rule and calculates a full rate adjustment. The interim rate adjustment comes into effect on January 12, 2004. Comments on the interim rule should be submitted by February 10, 2004. 68 Fed. Reg. 69563 Source: HK Law
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

China Building Island Big Enough for Airstrip

Satellite images show China is building an island on a reef in the disputed Spratly Islands large enough to accommodate what could be its first offshore airstrip in the South China Sea,

 
 
Maritime Careers / Shipboard Positions Naval Architecture Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0830 sec (12 req/sec)