Collapsed Mississippi Gulf Rig Leaves 8 Injured

Friday, September 12, 2003
A Coast Guardsman and a Gulfport Fire Department paramedic aboard a Coast Guard helicopter tend to an injured worker from the jack-up rig Parker 14 J that collapsed off the Mississippi-Louisiana coast yesterday. (U.S. Coast Guard photo).

The 41 people aboard an offshore drilling rig that collapsed off the Mississippi-Louisiana coast yesterday afternoon have been rescued.

Eight people were injured in the accident and were taken by New Orleans-based Coast Guard helicopters to Gulfport Regional Airport for further transfer by awaiting EMS personnel to Gulfport Memorial Hospital. With the extent of the injuries still unknown, it was reported that a sheen measuring approximately 200 yards wide and four miles long is now visible at the accident scene, drifting away in a southeasterly direction.

Three commercial vessels rescued the 36 remaining survivors and are transporting them to Venice, La. The supply vessel LCD picked up 27, the crew boat David McCall picked up six, and the crew boat Brazos Express picked up six people.

The rig, Parker 14 J, an 85-ft. (25.9-m) jack-up rig owned by Parker USA Drilling Co., based in New Iberia, La., collapsed at about 3:20 p.m. yesterday in 40 ft. of water in an area known as Chandeleur Block 27. There is reportedly 10,500 gallons of diesel fuel on board the rig, however there have not yet been any reports of pollution.

Coast Guard marine investigators on scene reported that the rig is partially submerged, however the exact cause of the accident remains unknown and will be investigated by the Coast Guard Marine Safety Office New Orleans.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

China Building Island Big Enough for Airstrip

Satellite images show China is building an island on a reef in the disputed Spratly Islands large enough to accommodate what could be its first offshore airstrip in the South China Sea,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1669 sec (6 req/sec)