Keel Laying Ceremony for CVN 77

Friday, September 05, 2003
Navy tradition dictates that each ship constructed for the Navy be honored by ceremonies on four historic occasions: keel laying, christening (or launching), commissioning, and decommissioning. George H. W. Bush (CVN 77) will be honored with the first of its historic occasions on Saturday, September 6, at Northrop Grumman Newport News Shipbuilding in Newport News, VA. The keel laying celebrates the laying of the first timber of a ship and can be traced back to the construction of early Navy ships. The present-day ceremony maintains the tradition, but has been modified because of updated materials, technology, and shipbuilding techniques. Following the ceremony, the former President Bush will initial a nameplate to authenticate the keel that will then be welded to it. President Bush will then announce, "the keel has been truly and fairly laid." Also participating in the ceremony will be Doro Bush Koch, the Ship's Sponsor and the daughter of former President Bush; the Honorable Hansford T. Johnson, Acting Secretary of the Navy; Admiral Vernon Clark, Chief of Naval Operations; the Honorable John Warner, U.S. Senator from Virginia; Tom Schievelbein, President, Northrop Grumman Newport News; and Admiral James L. Holloway III (ret.), Chairman of the Naval Historical Foundation. As the tenth and final Nimitz-class carrier, George H. W. Bush will stretch 1,092 feet, weigh 97,000 tons, and will be among the world's largest warships. Its top speed will exceed 30 knots and, with two nuclear reactors, it can operate for more than 20 years without refueling during its 50-year service life. The Navy awarded Northrop Grumman Newport News the CVN 77 construction contract in January 2001. A December 2002 ceremony marked the formal naming of CVN 77 after the former president and World War II Navy aviator. The carrier will be delivered in 2008 and join the fleet in 2009.

Marine Propulsion

C-Job Designs Flettner Freighter for Switijnk

The Dutch shipping company family Switijnk has contracted C-Job Naval Architects to develop a Rotor Sail-equipped design to meet their specific loading and sailing profile.

MN100: R.W. Fernstrum & Company

The Company: R.W. Fernstrum & Company set the standard in marine heat exchangers over 65 years ago, building a reputation focused on innovation. Today, its commitment is to continual improvement,

SMM 2016: World Premieres from around the Globe

Some 50,000 trade visitors from the whole of the world are expected in Hamburg for the start of SMM in less than two weeks. And once again, it is fully booked – with a total of more than 2,

Navy

White House: Iranian Ships' Actions in Gulf Increase Risk of Miscalculation

Actions by Iranian vessels in several encounters with U.S. warships in the Gulf this week are cause for concern and increase risks of miscalculation, the White House said on Friday.

Australia Warns DCNS after Security Breach

Australian defence officials warned French naval contractor DCNS to beef up security in Australia, where it is preparing to build a A$50 billion ($38.13 billion) fleet of submarines,

Scorpene Submarine Data Leak: Setback to Indian Navy

India has began multiple investigations to determine the extent of damage caused by the reported massive leak of secret data detailing the combat and stealth capabilities

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Pipelines Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0647 sec (15 req/sec)