Manitowoc to Build Additional Buoy Tenders for USCG

Tuesday, November 27, 2001
The Manitowoc Company, Inc. today announced that its Marinette Marine subsidiary was awarded options to build two additional seagoing buoy tenders for the U.S. Coast Guard. The options, valued at approximately $60 million, are extensions to an existing series of contracts awarded by the Coast Guard in 1993 and 1998 to build up to 16 Juniper-class buoy tenders.

"These options mark nearly $350 million in new shipbuilding contracts won this year alone, and they further enhance our position as the U.S. Coast Guard's largest supplier of shipbuilding and ship-repair work," said Terry D. Growcock, Manitowoc's president and chief executive officer. "We're pleased to continue the strong partnership between the U.S. Coast Guard, Manitowoc Marine Group, and Marinette Marine."

The two new Juniper-class (WLB) buoy tenders - numbers 15 and 16 in the series - will be 225 feet in length and will operate with a crew of six officers and 34 enlisted personnel. These technically advanced, multi-mission vessels will be equipped to perform search and rescue, law enforcement, pollution response, and domestic icebreaking missions, as well as servicing aids to navigation.

Scheduled for delivery in April and September of 2004, it is proposed that at least one of the additional cutters will be homeported on the Great Lakes. Earlier this year, Manitowoc Marine Group was also awarded multiple contracts to build three 310-foot passenger ferries for the City of New York, two 127-ft. oceangoing tugs and two double-hull tank barges for a commercial customer, and an $82.4 million Great Lakes icebreaker to replace the USCGC Mackinaw.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1215 sec (8 req/sec)