Diakun Named VP at Northrop Grumman

Thursday, June 05, 2008

Northrop Grumman Corporation has appointed Peter C. Diakun to vice president of platform integration and technology development. He reports to Eric Womble, vice president of the advanced capabilities group for Northrop Grumman Shipbuilding.
Northrop Grumman Shipbuilding, the newly-formed sector of Northrop Grumman Corporation, is made up of the former Northrop Grumman Ship Systems and shipbuilding sectors.
Diakun's responsibilities include leading technology development and platform integration programs for the and shipyards. Specific programs include warfare systems, networks, integrated power, operations research, operational capabilities analysis, and modeling and simulation. He will also have operational responsibility for the Virginia Advanced Shipbuilding and Carrier Integration Center (VASCIC) and Washington Engineering office. He will be based in

Diakun has more than 22 years of experience in submarine and surface ship programs with the former sector, most recently serving as director for technology development. His responsibilities have included managing technology development, research and development and warfare systems programs for nuclear-powered carriers and submarines.

He earned a bachelor's degree in electrical engineering from Virginia Tech and a master's degree in management of business administration from Rensselaer Polytechnic Institute.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Liebherr to Deliver RTGs to Mayotte and Manila

Liebherr confirms orders for variable speed RTGs and electric RTGs. DPWorld Asian Terminals Inc. has placed an order with Liebherr Container Cranes for a further 5 RTGs at its Manila facility.

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

DP World Receives 1st Scheduled Vessel at New Terminal

DP World has yesterday welcomed the first scheduled vessel to call at its new Container Terminal 3 in Jebel Ali, Dubai, as it gears up to serve customers at the state-of-the-art facility.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1235 sec (8 req/sec)