Stena Continues Ferry Upgrades with SPS Overlay

Friday, June 13, 2008

This repair to the Stena Transfer is the seventh SPS Overlay project completed for Stena Line since 2002.
Over 650m of the Stena Transfer’s main deck, tweendeck and shelter deck were reinstated using SPS Overlay.  Unlike disruptive ‘crop and replace’ techniques, SPS Overlay is non-intrusive, the existing structure remained intact and the insulation, piping and services untouched. This contributed to significant schedule savings and to getting the Stena Transfer back in service quickly. 

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


MV Miner Cleanup Complete

The Cape Breton community is celebrating after the last scraps of a rusting shipwreck were finally hauled from the shores of Scatarie Island.   Nova Scotia Lands

PCC Fleet Gowth Decelerates

Last year PCC (Pure Car Carrier, including Pure Car & Truck Carrier) sector demand growth appeared to have stalled, and the indicators suggest that there hasn’t

Bunker Fuel Market Poised 460 million tons by 2020

Transparency Market Research launched its latest study on the global bunker fuel market, in terms of revenue and volume. The report predicts that the global

Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Pod Propulsion Port Authority Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0717 sec (14 req/sec)