Stena Continues Ferry Upgrades with SPS Overlay

Friday, June 13, 2008

This repair to the Stena Transfer is the seventh SPS Overlay project completed for Stena Line since 2002.
Over 650m of the Stena Transfer’s main deck, tweendeck and shelter deck were reinstated using SPS Overlay.  Unlike disruptive ‘crop and replace’ techniques, SPS Overlay is non-intrusive, the existing structure remained intact and the insulation, piping and services untouched. This contributed to significant schedule savings and to getting the Stena Transfer back in service quickly. 

Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

MARAD Shipbuilding Loan Guarantee

The launch of the Bravante IX, built in a U.S. shipyard, was from the investments made by the Maritime Administration (MARAD) just three years ago. The investment

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

Voith Schneider Propellers Drive Double-ended Ferry MS Frisia IV

Ferries operated by Norden-Frisia AG have been serving the East Frisian island of Norderney for many decades. Navigation in these coastal waters poses special

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2013 sec (5 req/sec)