GE LM2500+G4 Gas Turbine Module Delivered By Avio for Frigate

Tuesday, September 02, 2008
Shown is the LM2500+G4 gas turbine module supplied by Avio which was recently delivered to DCNS’ shipyardinFrance. Photo courtesy ofAvio.

GE Marine reports that the first LM2500+G4 aeroderivative marine gas turbine module has been delivered by Avio to DCNS’ shipyard in . The engine will be the basis for the COmbined Diesel eLectric And Gas turbine (CODLAG) propulsion system that will power the French Navy’s first European Multi-Mission Frigates (FREMM) ship.

Avio, , is a GE Marine Systems Supplier, as well as the prime contractor for the FREMM gas turbine system. The French and Italian Navies are jointly developing the FREMM program, and combined, the navies are slated to build a total of 27 next-generation frigates. Avio has ordered the initial three LM2500+G4 gas turbines, two of which have already been delivered to Avio’s facility in .

Earlier in 2008, GE reported the successful completion of the entire 500-hour qualification test for the LM2500+G4 gas turbine at the company’s test cell. The rigorous testing plan devised by GE was tailored so that the engine will be certified by three key organizations: Bureau Veritas, RINA S.p.A. and American Bureau of Shipping (naval vessel rules),

Introduced in October 2005, the G4 version of the popular LM2500 family offers 17% more power than its LM2500+ predecessor, and has a 6% increase in airflow over the current LM2500+ model. The LM2500+G4 is expected to provide the same 99.6% reliability of the LM2500, which currently has a fleet of more than 2,000 gas turbines in diverse marine and industrial applications.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

USCG, National Park Service Rescue Sea Turtle

Members from the U.S. Coast Guard and National Park Service rescued a loggerhead sea turtle Sunday in Oregon Inlet. Watchstanders at Coast Guard Sector North Carolina

Bulk Equipment is Delivered to Syzran Refinery

A reactor and a cold high-pressure separator is delivered to the site of Rosneft subsidiary Syzran Refinery for the constructed diesel hydro-treater. The unit

Achinsk Refinery Resumes Operation on Tight Schedule

Achinsk Oil refinery, suspended after the incident of June 15, 2014 has recovered the processes of primary crude oil processing on a tight schedule, according to the plan of repair activities.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1793 sec (6 req/sec)