Ultra-Deepwater Drillship Contract

Thursday, October 30, 2008

The rig is listed in the Transocean Fleet Update Report dated August 5, 2008, along with nine other announced ultra-deepwater newbuild units, as the "HHI Drillship TBN (to be named)."

The five-year drilling contract is expected to commence in the fourth quarter of 2010, following shipyard construction. The contract commencement date is contingent on vendor performance and other factors. Contracted revenues related to the five-year contract term are approximately $1.17b to $1.19b, depending on countries of operation during the contract term. Estimated contract revenues represent the maximum amount of revenues that may be earned, excluding revenues for cost escalations, customer reimbursed equipment and miscellaneous adjustments.

Construction of the unnamed dynamically positioned, double-hull drillship is scheduled to take place at the Hyundai Heavy Industries shipyard in , with the first steel cutting scheduled in January 2009. The estimated total capital expenditure for the drillship, is approximately $740m, excluding customer reimbursed equipment and capitalized interest. The rig design is an enhanced version of Transocean's C.R. Luigs and Jack Ryan-class drill ship designs. It will feature Transocean's patented dual-activity drilling technology, allowing for parallel drilling operations designed to save time and money in deepwater well construction, compared with conventional rigs. It will also feature a third load path through a 165-metric-ton Active Heave Compensating Crane for subsea construction activity. The rig will also have expanded completion capabilities and a variable load of 20,000 metric tons.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Wind-powered Oil Recovery Project Green-lighted

The DNV GL-led WIN WIN Joint Industry Project (JIP), which melds offshore wind with offshore oil and gas, shows that for suitable fields,finds that  wind-powered

Barge Master Wins Innovation Award at OTC

The Barge Master T40 motion compensated knuckle boom crane has been recognized for technological innovation, winning the Spotlight on New Technology Small Business

Keppel Acquires LeTourneau

Keppel Offshore & Marine (Keppel O&M), through its wholly owned subsidiary, Keppel Offshore & Marine USA, Inc., has completed the acquisition of Cameron International

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0673 sec (15 req/sec)