USS New Orleans Enters Dry Dock

Tuesday, April 28, 2009

USS New Orleans (LPD 18) entered a dry dock in Bahrain April 25 to continue repair work on the ship's hull. The Navy signed a firm fixed-price contract with Arab Shipbuilding and Repair Yard (ASRY) Shipyards in Manama, Bahrain to repair New Orleans.

The repair contract includes planning efforts, material procurement, pre-fabrication and dry dock repair work and is expected to be completed in 10 to 14 days.

The amphibious transport dock was damaged in a collision with USS Hartford (SSN 768) March 20, 2009.

The ship dry docked in ASRY Shipyards Graving dock located in Manama, Bahrain. Two commercial vessels are in the graving dock at the same time as New Orleans, Motor Vessel Virginian and Ensco-97. Virginian is a U.S. flagged munitions ship often contracted by the Military Sealift Command. Ensco-97 is a Liberian flagged oil drilling rig owned by U.S. based Ensco International Incorporated.

While New Orleans will be repaired in Bahrain, U.S. Naval Sea Systems Command engineers determined that Hartford will be repaired in the United States. The submarine recently completed sea trials and is underway, making a surface transit back to her homeport of Groton, Conn.

Prior to the submarine's departure from Bahrain, Master Chief Machinist Mate (SS) Jon Wells relieved Master Chief Electronics' Technician (SS) Stefan Prevot as "Chief of the Boat," the senior enlisted Sailor aboard Hartford.

The appointment of Wells, who is assigned as Hartford's engineering department master chief, is expected to be temporary. A new Chief of the Boat is expected to be named by the time Hartford arrives in Groton.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Two ASD Tugs Delivered to URAG

URAG has taken delivery of two ASD 2411 Tugs to add to its existing fleet. Named Brake and Perfect, the new vessels have joined their sister ship Prompt in the

Hamburg Süd Christens Third San Class Ship

Hamburg Süd christened its third container vessel in the new San class yesterday, officially naming newbuild San Vicente at the Cuenca del Plata terminal in Montevideo.

Rolls-Royce Propulsion for Polar Research Vessel

Rolls-Royce informs it has been awarded a contract by shipbuilder Fincantieri to supply a fully integrated propulsion system for Norway’s new Polar Research Vessel,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1695 sec (6 req/sec)