Canadian CG, $5M Order for Zodiac RIBs

Sunday, October 25, 2009
Photo courtesy PEMS Marine & Offshore PR

The Canadian Coast Guard (CCG) is making a significant upgrade to its small boat fleet following an order placed for 25 rigid inflatable boats (RIBs) from Zodiac Hurricane Technologies. The order is valued at $5m and represents a major commitment by the Coast Guard towards maintaining the quality and effectiveness of its equipment. The Zodiac Hurricane Model 753 boats will be manufactured at the company’s factory at Delta, British Columbia and will be used by the Coast Guard for both shore based and shipboard search and rescue work.
 
The new 26.2 ft Zodiacs have been chosen to replace earlier models that, in some cases, have been in service with the Canadian Coastguard for up to 17 years. In that time the boat has established a reputation for dependable seaworthiness by demonstrating an ability to work in 16.5 ft swells and, being powered by two 175 horse power outboards, the Zodiac 753 RIB has the ability to reach speeds up to 48 knots. The CCG operates its rescue boats with a crew of three which gives them the capacity to carry up to nine survivors.
 
Zodiac Hurricane Technologies enjoys a close relationship with the Canadian Coast Guard and has worked with it to develop a specification that meets its needs. The 753 model is a Transport Canada, IMO SOLAS approved rescue boat. By refining the specifications of the new boats, Zodiac has been able to supply new RIBS that provide the rugged seaworthiness and features that the CCG has become used-to.
 
Customisation of the new boats has included refining their ergonomics to meet the operational needs of the Coast Guard crews. Improvements include the development of a new generation of Zodiac’s three-person fibreglass Delta console with two-person wide aft navigation/communications console and Shockwave S2 shock reducing seating. The boats will be delivered with navigation/communications systems installed that include either Raymarine or Garmin equipment. The suites include radar, chart plotter, GPS, VHF radios and echo sounder. The Canadian Coast Guard also adds equipment specific to its search and rescue and other missions.
 
The full quota of the new Zodiacs will be distributed among Canadian Coast Guard stations and ready for operation in Spring 2010.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

BHGI-designed ATB Unit Under Construction

Bristol Harbor Group, Inc. (BHGI) informs it is currently completing the detail design phase of a 399’ x 74’ x 30’ 80,000 BBL double hull oil tank barge and a 120’

Scorpio Bulkers Sells Three Newbuilds for $111m

Scorpio Bulkers Inc. announced that it has entered into agreements to sell three newbuild dry bulk vessels, including two Capesize ships and an Ultramax ship, for

Horizon Delivers Second 80’ Towboat to FMT

Horizon Shipbuilding, Inc. announced the delivery of another 80’ Inland River Towboat, the M/V Chip Stiebing, to Florida Marine Transporters (FMT) of Mandeville, La.

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2253 sec (4 req/sec)