G&G Shipping Orders 190-ft Landing Craft

Wednesday, February 24, 2010
Photo courtesy G&G Shipping

G&G Shipping announces that it has signed and awarded a contract for new construction of a shallow draft 190’ roll-on, roll-off, landing craft to be built by St. Johns Shipbuilding in Palatka, Florida.
Mike Grandonico, President of G&G Shipping, states, “We work to continuously offer the best, most reliable, on-time shipping service for our customers throughout the Caribbean and this new vessel will allow us greater capability to expand this quality service to our customers.”
Construction of the yet-to-be-named vessel will be performed at St. Johns Shipbuilding’s 90 acre, state-of-the-art facility located near Jacksonville, Florida. Delivery of the vessel is expected November 2010.

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Wärtsilä Strengthens Its Position in China with New Propulsion Orders

Two new marine geological research vessels under construction in China will feature a broad scope of Wärtsilä engines and propulsion equipment. Wärtsilä has maintained

AMC’s Tempest in the Water

Aluminium Marine Consultants (AMC) lowered the new Crew Transfer Vessel Tempest into the water for the first time on November 16, 2015, on time and on schedule for handover mid December.

Damen’s Norway Foray

The Damen Shipyard Group’s man in Norway likes picking up the phone these days. With offshore markets in the doldrums, a unique phenomenon is occurring: “Norwegians are talking to me,

Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0544 sec (18 req/sec)