New USACE Contracts

Tuesday, March 02, 2010

Weeks Marine, Inc., Covington, La., was awarded on Feb. 25, 2010, a $58,509,050 firm-fixed-price contract for work consisting of mechanical and hydraulic construction of containment levees requiring deep excavation to minus-70 ft, shoreline protection, and spillbox rehab to increase the capacity of Placement Areas 14 and 15; and maintenance and new work dredging of the Houston Galveston Navigation Channel Bayport to Morgans Point with four options.  Work is to be performed at Harris County, Texas, and Chambers County, Texas, with an estimated completion date of March 31, 2012.  Thirty-four bids were solicited with four bids received.  U.S. Army Engineer District Galveston, Texas, is the contracting activity (W912HY-10-C-0016).

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Total CEO Killed in Moscow Runway Accident

Private jet collided with snow plow during takeoff; Total's CEO a defender of Moscow policies. Insiders Boisseau and Pouyanne long seen as potential successors.

Offshore Oil: Lamprell Completes Caspian Sea Drilling Unit

UAE-based Lamprell said that it completed construction of the second Caspian Sea jackup drilling rig, Mercury, for service in the Caspian Sea.   "I am delighted

Salamander Energy Updates on SONA Transaction

Salamander Energy said it has submitted a draft shareholder circular to the Financial Conduct Authority in relation to previously stated plans to divest of an interest in the Greater Bualuang Area.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2150 sec (5 req/sec)