Acergy Gets $700m from Total for Angola Offshore Work

Wednesday, January 02, 2008
Acergy SA received a $700mcontract from Total SA for work on the development of Pazlor oil field offshore from Angola. Acergy said Wednesday it received the contract as part of a $1.8b award to a consortium with French oil services company Technip SA Acergy's portion of the project includes the engineering, procurement, fabrication and installation of 55 kilometers of water-injection lines, gas-injection and gas-exports lines, umbilicals and more than 20 rigid jumpers among others tasks.

The company said engineering will begin immediately; offshore installation is scheduled to begin in mid-2010. Acergy, a Sunbury-on-Thames, England, engineering and contruction contractor for the offshore oil and gas industry, had 2006 revenue of $2.12b.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Falklands' Oil Drilling at Isobel Deep Suspended

Oil explorers drilling in the waters north of the Falkland Islands have suspended work on the second well of their 2015 current six-well drilling campaign after a technical problem.

Arctic Nations to Fight Climate Change Despite Russia Tensions

The eight Arctic Council nations pledged on Friday to do more to combat climate change that is shrinking the vast frigid region, with countries trying to put

OSV Technology: Notable Designs & Deliveries

Though the market for Offshore Support Vessels (OSVs) is soft, advances in technology, fit and finish in  the sector is unrivaled in any other maritime niche over the past five years.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0915 sec (11 req/sec)