ACMA, VT Halter Awarded NOAA Contract

Wednesday, November 10, 2004
Alan C. McClure Associates (ACMA) said that the National Oceanic and Atmospheric Administration (NOAA) awarded ACMA and VT Halter Marine Phase II of a three-part contract that calls for the design, development and construction of a new Small Waterplane Area Twin Hull (SWATH) coastal mapping vessel (CMV).

Initially, NOAA awarded two teams the chance to participate in the first phase of the project. ACMA and VT Halter Marine were one of the two teams that qualified for Phase I, a stage that lasted four months and consisted of Feasibility Analysis and Preliminary Design contracts. Phase II will entail the Contract Design and is expected to wrap up around May of 2005. At that time, NOAA will decide whether to proceed with the last phase of the program which will be the Detail Design and Construction of the NOAA SWATH CMV. The primary mission of the ship will be to conduct full seafloor mapping of coastal areas. Doug Ottens, principal marine engineer with ACMA, explained the significance in terms of US National Security, “In mapping the U.S. coastal seafloor, we will be able to monitor discrete changes and detect any potential intruders.”

Ottens went on to note that operations will be conducted continuously 24 hours a day and that the mission will be accomplished by:

· Conducting basic hydrographic surveys via full seafloor ensonification

· Periodic navigational area clearance of fairways and approaches to ports

· Diver or small boat resolution of individual significant items deemed hazardous to surface navigation

· Conducting research in support of nautical charting and seafloor mapping

“ACMA is known for cost-effective design and mission flexibility,” said ACMA President Scott McClure. “Add that to our unrivaled experience in SWATH development, and our capabilities are a perfect match for this assignment. Should NOAA decide to move forward in 2005 with the detail design and construction of the NOAA SWATH CMV, ACMA and VT Halter Marine look forward to being the team that completes the final phase of this assignment.”

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

Charter Boat Crew Rescued in Gulf of Mexico

U.S. Coast Guard search and rescue crews worked throughout the night to find a missing charter boat with four people aboard as far as 70 miles off Galveston. A

USCG Assists Stranded Charter Vessel

U.S. Coast Guard (USCG) crews are assisting a disabled passenger vessel approximately 13 miles east of Nahant, Massachusetts, Monday. Watchstanders at Coast

S.Korea Ferry Boss's Driver Turns Self In

The driver of a South Korean businessman wanted over the sinking of a ferry that killed 304 people turned himself in on Tuesday, potentially unlocking the mystery

Vessels

London Shipping Professionals Weigh in for SPNL Report

The Shipping Professional Network London (SPNL) has  released their full Future London report, an initiative that gathered the views and opinions of London’s young

U.S. Marshalls Ordered to Seize Kurdish Oil Cargo off Texas

Acting on a request from the central government in Iraq, a U.S. judge has signed an order telling the U.S. Marshals Service to seize a cargo of oil from Iraqi Kurdistan

Aker Philadelphia Shipyard ASA: Purchase of own shares

Aker Philadelphia Shipyard AKPS), a leading U.S. commercial shipyard constructing vessels for operation in the Jones Act market, has on July 25, 2014 purchased 1,

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1629 sec (6 req/sec)