ACMA, VT Halter Awarded NOAA Contract

Wednesday, November 10, 2004
Alan C. McClure Associates (ACMA) said that the National Oceanic and Atmospheric Administration (NOAA) awarded ACMA and VT Halter Marine Phase II of a three-part contract that calls for the design, development and construction of a new Small Waterplane Area Twin Hull (SWATH) coastal mapping vessel (CMV).

Initially, NOAA awarded two teams the chance to participate in the first phase of the project. ACMA and VT Halter Marine were one of the two teams that qualified for Phase I, a stage that lasted four months and consisted of Feasibility Analysis and Preliminary Design contracts. Phase II will entail the Contract Design and is expected to wrap up around May of 2005. At that time, NOAA will decide whether to proceed with the last phase of the program which will be the Detail Design and Construction of the NOAA SWATH CMV. The primary mission of the ship will be to conduct full seafloor mapping of coastal areas. Doug Ottens, principal marine engineer with ACMA, explained the significance in terms of US National Security, “In mapping the U.S. coastal seafloor, we will be able to monitor discrete changes and detect any potential intruders.”

Ottens went on to note that operations will be conducted continuously 24 hours a day and that the mission will be accomplished by:

· Conducting basic hydrographic surveys via full seafloor ensonification

· Periodic navigational area clearance of fairways and approaches to ports

· Diver or small boat resolution of individual significant items deemed hazardous to surface navigation

· Conducting research in support of nautical charting and seafloor mapping

“ACMA is known for cost-effective design and mission flexibility,” said ACMA President Scott McClure. “Add that to our unrivaled experience in SWATH development, and our capabilities are a perfect match for this assignment. Should NOAA decide to move forward in 2005 with the detail design and construction of the NOAA SWATH CMV, ACMA and VT Halter Marine look forward to being the team that completes the final phase of this assignment.”

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

Ill-fated Korean Ferry May Have Been Going too Fast

It should have been plain sailing for a South Korean ferry carrying hundreds of children and their teachers on an outing to the sub-tropical island of Jeju, an annual trip for Danwon High School.

South Korea's Park: Ferry Crew Conduct Tantamount to Murder

South Korean President Park Geun-hye said on Monday the actions of some crew of a ferry that sank with hundreds feared dead were tantamount to murder, as a four-year-old

3rd Officer at helm when ferry capsized - Investigator

The third officer was at the helm of a South Korean ferry when it capsized on Wednesday with 475 people on board, an investigating prosecutor told a news conference on Friday,

Vessels

Coast Guard Inspects Cleveland's First Containership

U.S. Coast Guard marine inspectors conducted safety and security examinations on the first-ever containership to arrive in Cleveland Saturday morning. The Fortunagracht,

Captain of Korean Ferry Praised Safety in Promotional Video

The captain of a ferry that sank off South Korea's southwestern tip with hundreds feared dead said in a promotional video four years ago that the journey was

Bodies found trapped in S Korean ferry

Divers searching for survivors of a capsized South Korean ferry saw three bodies floating through a window of a passenger cabin on Saturday but were unable to retrieve them,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1251 sec (8 req/sec)