Aker Kvaerner Contracted for Deepwater Installation

Thursday, December 22, 2005
Chevron with partner Kerr-McGee has awarded Aker Kvaerner a contract for marine operations for installation of the Blind Faith platform in the Gulf of Mexico. The contract value is estimated to approximately $35 million. The new contract will be executed by the Aker Kvaerner company Aker Marine Contractors, and includes installation of a mooring system, topside transport, transportation and installation of the Blind Faith semisubmersible platform as well as hook up of the risers of the Aker Kvaerner company. In October, Aker Kvaerner secured a contract for provision of the hull and mooring system for Blind Faith, in which Aker Marine Contractors plays a key role. In the new contract, Aker Marine Contractors will perform all engineering and construction activities related to transportation and installation of the Blind Faith platform. The platform will be located in the Missisippi Canyon block 650, situated approximately 162 miles southeast of New Orleans. The water depth at the field is 2 000 meters. Aker Marine Contractors announced in August a five year charter agreement with Taubåtkompaniet for the specialised offshore construction vessel "BOA Sub C" (formerly announced as "BOA Deep C II"). This vessel will be used for the offshore installation activities for Blind Faith. "BOA Sub C" is expected to enter the market towards the end of 2006, and is a larger version of the sister vessel "BOA Deep C" which is currently operating in the Gulf of Mexico. The project will commence immediately and offshore transportation and installation will be performed from September 2007.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Mobil Says Oil Discovery off Guyana is 'Significant'

Unlike almost all its neighbors, Guyana isn’t an oil producer yet. But the energy giant Exxon Mobil recently announced it had discovered “significant” oil off the coast.

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

IMO Adopts Polar Code Environmental Provisions

United Nations' International Maritime Organization (IMO) has adopted the environmental part of the Polar Code. Hereby, internationally binding regulations on

Navy

Alaska, Washington to build Arctic Icebreakers

Senator Lisa Murkowski, Alaska, and Senator Maria Cantwell, Washington, have introduced a bill that would authorize the Navy to build up six icebreakers for use by the U.

Launch of First Future Destroyer, Hobart

Speech delivered by the Minister for Defence, Kevin Andrews during the launch of Hobart - the first future destroyer: Thank you for being here on this very important day.

Russian, Azerbaijani Navy to Hold First Ever Joint Drills in Caspian Sea

About 10 Russian and Azerbaijani ships will take part in a joint naval exercise in the Caspian Sea for the first time; RIA Novosti cited the statement of Russia’s Southern Military District.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1139 sec (9 req/sec)