Aker Philadelphia Keel Laying, 11th Product Tanker

Tuesday, March 23, 2010
Photo courtesy Aker Philadelphia Shipyard

Aker Philadelphia Shipyard (Oslo: AKPS) held a ceremonial keel laying on March 15 for Ship 015, the 11th product tanker being built at the yard. This vessel will be sold to OSG America after delivery from Aker Philadelphia Shipyard and will have shuttle tanker features installed for use in the deepwater U.S. Gulf of Mexico. Shuttle tankers transport crude oil from deepwater areas where there are no available pipelines. Following long held shipbuilding tradition, coins were placed on one of the keel blocks that support the vessel during construction before the first section of the ship was lowered into place. These coins are a ceremonial sign of good fortune and safe travels. The small ceremony was conducted with representatives of Aker Philadelphia Shipyard and OSG America.

In its eleven year history, Aker Philadelphia Shipyard has completed the construction of 12 ships, eight product tankers and four containerships, with four additional tankers currently under construction. To commemorate its early containership series, the shipyard has partnered with the Independence Seaport Museum in Philadelphia to showcase a model of the original containership from the series. The model will be on display at the museum beginning March 25, as part of the museum’s new exhibit titled, “It sprang from the River! Everyday Objects with Maritime Secrets.” The exhibit will run through January, 2011.

(www.akerphiladelphia.com)

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Ingram Barge Order 20 Tank Barges for 2015

Ingram Barge Company say they will be building 20 tank barges in 2015 to meet growing demand for chemical shipments. While most of the company’s recent tank barges have come through acquisitions,

ClassNK Issues New Rules for Inland Waterway Ships

Leading classification society ClassNK has released new technical rules and guidance for the survey and construction of inland waterway ships. As a result

Steel Cut for Third RCI Quantum-class Cruise Ship

The steel cutting for 'Ovation of the Seas', scheduled to be delivered in the autumn of 2016, took place at the Meyer Werft shipyard in Papenburg, Germany, where 'Quantum of the Seas',

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1794 sec (6 req/sec)