Aker Yards Signs Refurb Contract

Monday, October 17, 2005
Aker Yards and Silja Oy Ab have signed a contract for modernizing the two passenger-car ferries Silja Serenade and Silja Symphony. The refurbishment includes renewing the vessels passenger areas to conform to the demands of the future The project will be managed by Aker Finnyards Lifecycle services, which offers comprehensive and cost efficient services to cruise and passenger ship operators.

The refurbishment will be carried out in cooperation with partners. The Turku Repair yard offers facilities, and the project means work for several turnkey contractors.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Massive Layoff Ahead for Hyundai Heavy

Another massive reduction in the Korean shipbuilding workforce may come as most shipyards are still struggling with falling orders and mounting losses, reports Yonhap quoting industry sources.

USCG Foundation Run to Remember Events Announced

The Coast Guard Foundation, a non-profit organization committed to the education and welfare of Coast Guard members and their families, announced this year’s Run

Port of Vancouver CEO Coleman to Step Down

Todd Coleman, CEO of Port of Vancouver USA, step down from his position May 19, after 15 years with the port.   Coleman, a Professional Engineer, began his career with the port in 2001,

Ship Repair & Conversion

Sipu Muin Modernization Work to Begin in May

Canadian Coast Guard plans upgrades for Air Cushion Vehicle   A scheduled modernization of the Canadian Coast Guard CCGS Sipu Muin will see the Air Cushion Vehicle

Raytheon Anschütz Steering Gear Control for Luxury Cruise Ships

The German navigation system manufacturer Raytheon Anschütz was awarded a retrofit contract of steering gear control systems for two luxury cruise ships chartered by Noble Caledonia Ltd.

Ferry Drydocking Completed on 2-day Turnaround

Great Lakes Shipyard hauled out the Kelleys Island Ferry Kayla Marie on April 18 for its USCG five-year inspection survey. The yard completed all work, and refloated the vessel two days later,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0867 sec (12 req/sec)