AMFELS Lays Keel Ahead of Schedule

Wednesday, June 26, 2002
AMFELS Inc, the US wholly-owned subsidiary of Singapore’s Keppel Corporation Limited through Keppel Offshore & Marine Ltd, has laid the keel for new jack-up rig, Tonala, one month ahead of schedule. The $83 million contract for the rig was signed in April 2002 with Mexican company, Perforadora Central SA de CV. Tonala is a KFELS MOD V “B” class jack-up, enhanced with Keppel’s proprietary jacking and fixation systems developed by its research and technology arm, Offshore Technology Development. At the keel laying ceremony, Mr Ricardo Cortina Cardenas, Vice President for Marine Drilling Division of Perforadora Central said, “We are very pleased with the progress of the construction of Tonala, which is ahead of schedule. AMFELS has shown total commitment and excellent project management in the project.” In response, CY Ho, President of AMFELS, expressed his gratitude for the cooperation and team spirit shown by Perforadora Central’s construction team in enabling this milestone to be achieved. Due for delivery in the first quarter of 2004, Tonala is the fourth “B” class rig ordered in two years, reflecting customers’ confidence in Keppel’s design, engineering and construction capabilities. The first “B” class, Chiles Discovery was delivered by Keppel FELS in Singapore. Its sister rig, Chiles Galileo, now under construction at AMFELS for the same owner, Chiles Offshore Inc is due in September 2002. The third rig, Atwood Beacon, is currently being built in Keppel FELS for Atwood Oceanics Pacific Limited and is expected to be delivered in June 2003. Tonala incorporates modern engineering features to improve productivity, enhance safety, and provide added independence from supply lines and environmental conditions. It can drill in water depths up to 375 feet and is well suited for the environmental conditions of the Mexican waters of the Gulf of Mexico. The KFELS MOD V “B” class jack-up drilling rig is the latest solution for oil companies and drilling contractors looking for a more cost-effective deep-well drilling machine. The performance of the rig exceeds the operating capabilities of conventional non-harsh environment jack-ups.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Stranded Virginia Beach Bulker Salvage Plan Set

The Coast Guard advises it is in the final stages of reviewing a salvage plan that is scheduled to begin Friday morning to move the 751-foot bulk carrier, 'Ornak',

Two Marine Engineers Join Specialists EBDG

Naval architecture, marine engineering & production support service providers Elliott Bay Design Group LLC (EBDG) apprise that they have appointed marine engineers

Inchcape Shipping Services Opens in Venezuela

Inchcape Shipping Services (ISS), the world’s leading maritime services provider, has expanded its network in Central and South America with the opening of ISS Venezuela in Puerto La Cruz,

Finance

Canaveral Tops State List for Sand Bypass Funding

The Canaveral Harbor Inlet Sand Bypass Project has earned the top state ranking for 2014/15 inlet management funding. As a result, Port Canaveral is expected to receive $100,

Rotterdam port's throughput almost stable

The Port of Rotterdam’s throughput in the first quarter of 2014, at 109 million tonnes, was 0.2% below the level for the corresponding period last year.Split up by goods type,

PetroVietNam Gas's Q1 gross profit falls 27.5%

PetroVietNam Gas's first-quarter gross profit fell 27.5 percent to 3.9 trillion dong ($185 million) from a year earlier, the Lao Dong (Labour) newspaper reported.

 
 
Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1225 sec (8 req/sec)