Bay Bridge Enterprises Gets Latest Ghost Fleet Contract

Monday, November 13, 2006
MarAd will pay Bay Bridge Enterprises $494,000 to remove the Vulcan and tow it to its Chesapeake salvage yard on the Elizabeth River within 45 days. The Vulcan is a former Navy repair ship built in 1941. The Vulcan will be recycled for steel. The company will also remove and dispose of waste fuels and other potential pollutants on the ship. Bay Bridge Enterprises has gotten several contracts to scrap Ghost Fleet ships from the Maritime Administration.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Royal Caribbean Orders 3 Ships from STX

Following the delivery of Harmony of the Seas on May 12 in Saint-Nazaire, the American group Royal Caribbean Cruises Ltd. signed an order for three additional vessels,

FAL Engages Inland Marine Service for Marine Operations

French America Line, the newest U.S. cruise line that begins sailing five- to 10-day cruise itineraries aboard its intimate 75-stateroom flagship Louisiane in August,

Mumbai Port to Revamp Int'l Cruise Terminal

Indian Merchants’ Chamber provides a platform to urban developers to address various issues pertaining to the restructuring of Mumbai City Mumbai, May 23, 2016:

 
 
Maritime Security Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0589 sec (17 req/sec)