Bay Bridge Enterprises Gets Latest Ghost Fleet Contract

Monday, November 13, 2006
MarAd will pay Bay Bridge Enterprises $494,000 to remove the Vulcan and tow it to its Chesapeake salvage yard on the Elizabeth River within 45 days. The Vulcan is a former Navy repair ship built in 1941. The Vulcan will be recycled for steel. The company will also remove and dispose of waste fuels and other potential pollutants on the ship. Bay Bridge Enterprises has gotten several contracts to scrap Ghost Fleet ships from the Maritime Administration.

Cruise Ship Trends

Lucas Marine, Harbor Breeze Cruises Partner to Cut Fuel Costs

Lucas Marine is partnering with Harbor Breeze Corporation to help reduce the yacht charter and cruise company's fuel costs, maintenance and environmental impact in Los Angeles and Long Beach Harbors.

Pods Versus Water Lubricated Props

Thordon Bearings has called on the marine industry to investigate the characteristics of both conventional seawater-lubricated propeller shaft systems and podded

Grand Bahama Shipyard Adds Four Executives

Grand Bahama Shipyard Limited (GBSL), a Caribbean shipyard providing retrofit, refurbishment and revitalization to cruise and commercial vessels, has added four

 
 
Maritime Security Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0571 sec (18 req/sec)