Bay Bridge Enterprises Gets Latest Ghost Fleet Contract

Monday, November 13, 2006
MarAd will pay Bay Bridge Enterprises $494,000 to remove the Vulcan and tow it to its Chesapeake salvage yard on the Elizabeth River within 45 days. The Vulcan is a former Navy repair ship built in 1941. The Vulcan will be recycled for steel. The company will also remove and dispose of waste fuels and other potential pollutants on the ship. Bay Bridge Enterprises has gotten several contracts to scrap Ghost Fleet ships from the Maritime Administration.
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

EUROPA 2 Undergoes First Scheduled Docking

As part of its first scheduled docking, Hapag-Lloyd Cruises’ EUROPA 2 underwent technical maintenance at Blohm + Voss in Hamburg from April 11-24, 2015.   At the same time,

SCHOTTEL to Present Inland Offerings

SCHOTTEL will present its expertise to the U.S. inland market at the upcoming Inland Marine Expo in St Louis, June 15-17, 2015: strong push boats in Brazil, big

SCH Services Anthem of the Seas in Southampton

Terminal operators Southampton Cargo Handling (SCH) are utilizing their considerable experience in handling cruise vessels to service the biggest cruise ship to call in the port of Southampton.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Pipelines Pod Propulsion Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1813 sec (6 req/sec)