BG Secures U.S. LNG Rights

Thursday, May 17, 2001
Britain's BG Plc secured rights to deliver liquefied natural gas (LNG) through one of only two functioning import terminals serving booming U.S. energy markets. The UK gas producer will have use of 80 percent of capacity at CMS Energy's Lake Charles, La., facility from January 2002. It will have use of total capacity from September 2005 after a contract ends with an existing customer. Financial terms were not disclosed. BG Chief Executive Frank Chapman would only say that the deal involved payment of a "fixed annual fee" that will rise in 2005 to reflect the higher capacity used. But it is likely that BG fought off some stiff competition for the right to deliver LNG at a cost that in recent months has been less than half the delivered price of piped natural gas in a tight United States market. Longer term, indigenous U.S. gas production is in steep decline, and piped gas from Alaska is seen by experts as up to a decade away. LNG receiving capacity is in very short supply however, and even after two mothballed plants come back into operation LNG will be supplying only about four percent of the market. CMS's Lake Charles has a daily capacity send-out of 630 million standard cubic feet (mmcf) of gas. It plans to expand this by 300 mmcf but this extra capacity is not part of the BG deal. Cabot LNG, a unit of Belgian energy services company Tractebel, operates the only other active U.S. LNG receiving terminal at Everett in Massachussetts and also has an expansion plan. There are also plans to take two others out of mothballs next year. BG is a gas-rich exploration and production company with no existing LNG receiving capacity of its own, but whose strategy is to become an "integrated" company exploiting gas profits beyond the production stage through pipeline ownership, trading, power stations and LNG. LNG is natural gas deep frozen until it liquefies at a tiny fraction of its volume for shipment in special tankers to regasification plants like CMS's. The industry is booming worldwide as natural gas becomes the global fuel of choice and while pipeline construction is often too slow or to difficult, but there is a three-year backlog for new LNG tanker delivery and local resistance in places to the construction of receiving terminals. - (Reuters)
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Ensco Announces Cash Tender Offer

Ensco plc announced today that it has commenced a cash tender offer to purchase any and all of its outstanding 3.25% Senior Notes due 2016 (CUSIP No. 29358QAB5).

Seadrill: Rig Rates Have Not Bottomed

The market for oil and gas drilling rigs continues to deteriorate as oil companies cut back on investments, Seadrill Chief Financial Officer Rune Magnus Lundetrae

‘Blue Queen’ on First Mission

The platform supply vessel 'Blue Queen', an ULSTEIN PX121 design, was named at Ulstein Verft on Friday 27 February. The ship will be working in the spot market.

Tanker Trends

NORDEN Publishes CSR Report

Dampskibsselskabet NORDEN A/S has published its Corporate Social Responsibility (CSR) report 2014. Entitled, “On track”, the CSR report presents an overview of NORDEN’s CSR strategy,

Shipping Industry Faces Shake Up

As global shipping grapples with its worst downturn in 30 years, private equity firms are unwinding massive bets made on the sector in a move set to accelerate

Vessel Sales: February 2015

Vessel sales for February 2015  - (as of March 1) as prepared by Shipping Intelligence, Inc., New York.   Date Reported - Vessel Name - DWT - Built -  - (Age)

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1855 sec (5 req/sec)