BG Secures U.S. LNG Rights

Thursday, May 17, 2001
Britain's BG Plc secured rights to deliver liquefied natural gas (LNG) through one of only two functioning import terminals serving booming U.S. energy markets. The UK gas producer will have use of 80 percent of capacity at CMS Energy's Lake Charles, La., facility from January 2002. It will have use of total capacity from September 2005 after a contract ends with an existing customer. Financial terms were not disclosed. BG Chief Executive Frank Chapman would only say that the deal involved payment of a "fixed annual fee" that will rise in 2005 to reflect the higher capacity used. But it is likely that BG fought off some stiff competition for the right to deliver LNG at a cost that in recent months has been less than half the delivered price of piped natural gas in a tight United States market. Longer term, indigenous U.S. gas production is in steep decline, and piped gas from Alaska is seen by experts as up to a decade away. LNG receiving capacity is in very short supply however, and even after two mothballed plants come back into operation LNG will be supplying only about four percent of the market. CMS's Lake Charles has a daily capacity send-out of 630 million standard cubic feet (mmcf) of gas. It plans to expand this by 300 mmcf but this extra capacity is not part of the BG deal. Cabot LNG, a unit of Belgian energy services company Tractebel, operates the only other active U.S. LNG receiving terminal at Everett in Massachussetts and also has an expansion plan. There are also plans to take two others out of mothballs next year. BG is a gas-rich exploration and production company with no existing LNG receiving capacity of its own, but whose strategy is to become an "integrated" company exploiting gas profits beyond the production stage through pipeline ownership, trading, power stations and LNG. LNG is natural gas deep frozen until it liquefies at a tiny fraction of its volume for shipment in special tankers to regasification plants like CMS's. The industry is booming worldwide as natural gas becomes the global fuel of choice and while pipeline construction is often too slow or to difficult, but there is a three-year backlog for new LNG tanker delivery and local resistance in places to the construction of receiving terminals. - (Reuters)
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

GulfMark Offshore Records Highest Ever Q1 Revenue

Houston-based GulfMark Offshore President & CEO Quintin Kneen commented on his company's first quarter 2014 financial report: "We recorded our highest first quarter revenue ever,

Offshore Oil & Gas: Brazil’s Northern Frontier

In an effort to spread out oil and gas production to other parts of the country and increase overall oil production, Brazil has finally intensified hydrocarbon

Safety the Focus as Heavy Lifting Picks Up

Modern heavy lift capabilities are crucial for safe, efficient operations offshore Heavy lift operations offshore are an awe-inspiring feat, but an operation that

Tanker Trends

Global Shipping Exposed to Cyber Threats

The next hacker playground: the open seas - and the oil tankers and container vessels that ship 90 percent of the goods moved around the planet. In this internet age,

Euronav Posts 62% Core Profit Increase

Belgian crude oil shipping group Euronav on Wednesday unveiled a 62 percent rise in first-quarter core profit as daily rates for its fleet rebounded from last year.

Navios Time Charters Two Product Tankers

Navios Maritime Acquisition Corporation, an owner and operator of tanker vessels, has announced  that the Nave Equinox and the Nave Pulsar have been chartered out

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1093 sec (9 req/sec)