Bisso Completes Drill Rig Removal

Tuesday, July 27, 1999
Bisso Marine Co. has completed the salvage operation of a sunken drll rig at the Halter Gulf Repair Industrial Canal facility in New Orleans, La. The 145 x 97 x 22 ft. vessel sank 20 years ago, and had resisted many previous salvage attempts by other salvors. The rig was constructed with two 18 ft. diameter pontoons, which were connected by a substantial floor and interior bracing arrangement. Bisso's salvage plan called for cutting the 860 ton wreck into three sections, in order to lift each section from multiple sling points, due to its deteriorated condition. Each section was placed onto a deck barge and safely transported from the derricks to a local scrap yard for offloading and disposal.
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ross is Fleet Manager, Heidmar

Heidmar announced the promotion of Duncan Ross to Fleet Manager. Duncan joined Heidmar’s London office in 2012 as vessel manager.  Prior to joining Heidmar,

Diana Shipping Nets 2Q Loss

Diana Shipping Inc. today reported a net loss of $14.1 million and net loss attributed to common stockholders of $15.5 million for the second quarter of 2015, compared to net loss of $5.

U.S. Drillers Add Rigs Despite Crude Collapse

U.S. energy firms added 5 oil rigs this week after putting 21 rigs into service last week, the most in over a year, despite a collapse in U.S. crude prices from recent highs in June,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1038 sec (10 req/sec)