Bisso Completes Drill Rig Removal

Tuesday, July 27, 1999
Bisso Marine Co. has completed the salvage operation of a sunken drll rig at the Halter Gulf Repair Industrial Canal facility in New Orleans, La. The 145 x 97 x 22 ft. vessel sank 20 years ago, and had resisted many previous salvage attempts by other salvors. The rig was constructed with two 18 ft. diameter pontoons, which were connected by a substantial floor and interior bracing arrangement. Bisso's salvage plan called for cutting the 860 ton wreck into three sections, in order to lift each section from multiple sling points, due to its deteriorated condition. Each section was placed onto a deck barge and safely transported from the derricks to a local scrap yard for offloading and disposal.
Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

ESS Lands Second Contract with Dolphin Drilling

ESS Support Services Worldwide, part of Compass Group, has won a new, three-year contract, worth £10.5 million, to provide hotel and catering services to Dolphin Drilling Ltd.

Korea Shipbuilder Wins US$400-M Greek Order

Daewoo Shipbuilding & Marine Engineering Co., South Korea’s second-largest shipbuilder, says it has signed a contract to build 4 tankships for Maran Tankers Management,

Rolls Royce Marine Awarded LCS Engine Repair Contract

U.S. Department of Defense informs that Rolls Royce Marine North America, Walpole, Massachusetts, is being awarded a US$9,000,000 firm-fixed-price repair order

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1919 sec (5 req/sec)