Bisso Completes Drill Rig Removal

Tuesday, July 27, 1999
Bisso Marine Co. has completed the salvage operation of a sunken drll rig at the Halter Gulf Repair Industrial Canal facility in New Orleans, La. The 145 x 97 x 22 ft. vessel sank 20 years ago, and had resisted many previous salvage attempts by other salvors. The rig was constructed with two 18 ft. diameter pontoons, which were connected by a substantial floor and interior bracing arrangement. Bisso's salvage plan called for cutting the 860 ton wreck into three sections, in order to lift each section from multiple sling points, due to its deteriorated condition. Each section was placed onto a deck barge and safely transported from the derricks to a local scrap yard for offloading and disposal.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

ECO Orders Rolls-Royce Equipment for New AHTS

Rolls-Royce has been awarded a contract worth $30.6m with the American owner Edison Chouest Offshore (ECO). The contract for ship equipment comprises Azimuth main propulsion,

Seadrill: Rig Rates Have Not Bottomed

The market for oil and gas drilling rigs continues to deteriorate as oil companies cut back on investments, Seadrill Chief Financial Officer Rune Magnus Lundetrae

Kvichak, Vigor Announce Merger

Merger positions combined company to play a dominant role in recapitalization of North Pacific fishing fleet and emerging Arctic oil gas operations. Kvichak

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1673 sec (6 req/sec)