Bisso Completes Drill Rig Removal

Tuesday, July 27, 1999
Bisso Marine Co. has completed the salvage operation of a sunken drll rig at the Halter Gulf Repair Industrial Canal facility in New Orleans, La. The 145 x 97 x 22 ft. vessel sank 20 years ago, and had resisted many previous salvage attempts by other salvors. The rig was constructed with two 18 ft. diameter pontoons, which were connected by a substantial floor and interior bracing arrangement. Bisso's salvage plan called for cutting the 860 ton wreck into three sections, in order to lift each section from multiple sling points, due to its deteriorated condition. Each section was placed onto a deck barge and safely transported from the derricks to a local scrap yard for offloading and disposal.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Egypt Picks Jordan LNG Cargo Winners

Egypt has picked Shell, Vitol and Trafigura in a tender to supply four cargoes of liquefied natural gas (LNG) via Jordan's Aqaba import terminal, trade sources said.

Cameroon Awards Kribi Deepwater Contract

Cameroon has awarded a contract for its Kribi port to a consortium led by French logistics group Necotrans, the two parties said. The deepwater port will allow

Subsea 7 Bags $150 million Offshore UK Contract Maersk

Offshore contractor Subsea 7 has been awarded a $150 million subsea, umbilical, riser and flowline (SURF) contract by Maersk Oil for the development of the Culzean field in the UK North Sea.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.6954 sec (1 req/sec)