Blount-Barker Awarded Contract For Conversion

Friday, July 26, 2002
Blount-Barker Shipbuilding signed a contract on April 15th with Delaware River Port Authority (DRPA) to convert the M/V Essex to passenger only service. The 100 ft. open deck passenger/auto ferry with single ended propulsion will be converted to increase the maximum capacity from 149 to 600. Modifications include a conversion to double ended propulsion, enclosing the main deck and providing a steel canopy to cover the upper deck. The vessel will be converted for inspection and certification as a small passenger vessel in accordance with the requirements of 49CFR Subchapter K. The M/V Essex was originally built by Blount Marine Corporation in 1981 for the Lake Champlain Transportation Company. It operated as an auto/passenger ferry under USCG Subchapter T requirements for 20 successful years. The vessel, acquired by the DPRA in 2001 will be renamed the M/V Freedom and will service the Delaware River between Camden and Philadelphia. The M/V Freedom will be powered by 2 Caterpillar 3406C DITA engines producing 322hp at 1,800 rpm. The diesel engines will be coupled to Twin Disc 3:1 ratio MG-514C gearboxes and drive two 4-bladed 44"x 30"p Kahlenberg propellers. Twin 55 kW Northern Lights generators will provide the vessel's electrical needs. The M/V Essex was redesigned and engineered by Bristol Harbor Marine Design, a naval architecture and marine engineering company located in Bristol, Rhode Island. Reconstruction for the vessel began in mid-April with completion scheduled for October 2002.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Baltic Dry Bulk Index Dips on Weak Demand

The Baltic Exchange's main sea freight index, tracking rates for ships carrying dry bulk commodities, continued to dip on Wednesday due to sluggish demand across vessel segments.

OMB - Subchapter M Cleared for Publication

The Office of Management and Budget (OMB) completed its review of the draft final rule entitled Inspection of Towing Vessels, also known as "Subchapter M." The

Tanker Departs Libya Empty amid Political Crisis

A tanker that an oil company set up by Libya's eastern government prevented from loading has left the eastern port of Marsa el-Hariga, a port official said on Wednesday.

Ship Repair & Conversion

Ferry Drydocking Completed on 2-day Turnaround

Great Lakes Shipyard hauled out the Kelleys Island Ferry Kayla Marie on April 18 for its USCG five-year inspection survey. The yard completed all work, and refloated the vessel two days later,

Crane Upgrade for Jack-up Vessel Sea Installer

Major modification work will bring A2SEA-owned vessel into line with growing demands of offshore wind industry   Damen Shiprepair Amsterdam (DSAm), part of Damen Shiprepair & Conversion,

Saga Shipholding’s Optimarin Experience Drives BWT Orders

Ballast water treatment (BWT) specialist Optimarin has signed a contract with Saga Shipholding for the provision of three of its Optimarin Ballast Systems (OBS).

 
 
Maritime Standards Naval Architecture Navigation Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0863 sec (12 req/sec)