Bulbous Bow Fabricated and Installed on M/V Monte Carlo

Lauren Griffiths
Friday, April 14, 2006
In March 2006 Bay Ship & Yacht Co. installed two new series 60 Detroit Diesel engines, a new bulbous bow, bow thruster, and a new reinforced rub rail on the dinner boat Monte Carlo owned by Hornblower Yachts.

The initial design for modification work was drawn up by Dejong & Lebet of Jacksonville, Florida. Bay Design and Engineering provided detail design for most of the modification items, including a new engine bed design for proper shaft alignment, and CNC flat patterns for the bulbous bow.

Layout, fabrication and assembly of the bulbous bow was accomplished on the drydock by Bay Ship’s experienced pattern makers and welding crew. Meanwhile, a new bow thruster was fitted and welded in place, and new gensets, shafting, boarding gates, sewage transport system and mast were installed. After undocking, a new reinforced 4” x 8” rub rail design was patterned and installed.

The faster, stronger Monte Carlo is slated to go back into service in mid-April, 2006.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

US Funding for Air Emissions/Alternative Energy Projects

The U.S. Maritime Administration (MARAD) announced that up to $1.3 million in Federal funding is now available through cooperative agreements for projects supporting

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

News

DMW Marine Takes the Lead in Military Cranes

DMW Marine Group, LLC. has completed a number of projects for the U.S. Navy and foreign Navies in recent years, claiming a place as a go-to supplier for Navy departments globally.

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

USCG Tall Ship Sailing to the Bahamas

The U.S. Coast Guard Cutter Eagle is scheduled to arrive at Berth 14 at Prince George Wharf in Nassau, Bahamas on Thursday, May 28 as part of its 2015 cadet summer training deployment.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2845 sec (4 req/sec)