Del Monte Reefer Headed in for Fix

Friday, June 25, 2004
Philippines-based Keppel Cebu Shipyard, part of Singapore’s Keppel Offshore & Marine, has secured the drydocking and repair contract for Del Monte’s 7,079 dwt reefer Lerida Carrier. This vessel is managed by Cyprus-based Dobson Fleet Management. The reefer arrived at the shipyard at the beginning of this week after unloading a cargo from Japan. Repairs are expected to take eight days to complete Work on the NK-classed vessels includes propeller and tailshaft survey, overhauling of auxiliary engine governors (three units), ultrasonic cleaning of auxiliaries air coolers and drain coolers, renewal of main alternator shaft oil seals, renewal of engineroom pipe lines, steel works at chain locker area, repairs of accommodation ladders, load testing of eight cargo derricks and gooseneck inspection, external hull blasting and painting and general repairs.
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

U.S. Oil Train Traffic mostly from Midwest to East Coast

U.S. oil trains delivered more than 13.5 million barrels of crude oil from the Midwest to the East Coast in January, according to government data that gives a first

Maersk to Install Transas ECDIS on 100 Vessels

Maersk Line, the world's largest container company, has selected Transas Marine for ECDIS implementation on more than 100 vessels, Transas announced today. The

Baltic Sea Freight Index Edges Higher

The Baltic Exchange's main sea freight index, which tracks rates for ships carrying dry bulk commodities, edged higher on Monday as rates rose for vessels across all segments.

Ship Repair & Conversion

Methanol Powered Ferry Launched in Baltic Sea

Swedish ferry operator Stena Line has announced that it has converted the Stena Germanica to run on methanol, an industry first.   The company spent $24 million on converting the ship to methanol.

The Human Element of Ship Management

The best third party ship managers employ technology, good business practices, economies of scale and a customized approach for each client. None of that will

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

 
 
Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1216 sec (8 req/sec)