Deutz Secures Large Order For N. Sea Installation

Wednesday, January 05, 2000
Deutz has received another order from Wintershall for the installation of a power plant on its new production platform for operation in the German gas field A6A in the northernmost area of the German section of the continental shelf. This order follows a similar one, in which Deutz equipment is performing well on another Wintershall platform in the North Sea gas field D15. The plant consists of three generating sets: a gas engine genset, driven by a 16-cylinder engine of the 441 series and a diesel engine genset driven by an engine of the 620 series. The third set operates as an emergency genset.
Maritime Reporter February 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Barril Appointed COO of SBM Offshore

SBM Offshore is pleased to announce the appointment of Philippe Barril as Chief Operating Officer (COO) effective March 1, 2015.  Philippe's appointment as a

Sjo Resigns from Polarcus Board of Directors

Polarcus Limited announced that Hege Sjo will resign from its board of directors effective February 2, 2015.   Sjo has accepted an appointment as Deputy Director

BOEM Issues Supplemental Environmental Impact Statement

The U.S. Department of the Interior, Bureau of Ocean Energy Management (BOEM), announces the availability of the Draft Supplemental Environmental Impact Statement

 
 
Maritime Careers / Shipboard Positions Maritime Standards Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1024 sec (10 req/sec)