East Isle Christens Pair of Tugboats

Monday, October 27, 2008

(Source: The Chronicle Herald)

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Shipping Season Opens on the Mississippi

First tow marks unofficial opening to Mississippi River navigation season   M/V New Dawn arrived at Lock and Dam 2 near Hastings, Minn. Wednesday morning, marking

Two ASD Tugs Delivered to URAG

URAG has taken delivery of two ASD 2411 Tugs to add to its existing fleet. Named Brake and Perfect, the new vessels have joined their sister ship Prompt in the

Plans in Place to Test Intermodal River Transport

The Paducah-McCracken County Riverport Authority and Ingram Barge Company has announced plans to assess the viability of Intermodal River Transportation, utilizing

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0718 sec (14 req/sec)