First Orphan Basin Oil Exploration for mid-August

Tuesday, August 01, 2006
In mid-August, Chevron Canada will drill the first exploratory well in the Orphan Basin. According to industry experts, the exploration of the Orphan Basin could mean the beginning of a new and potentially lucrative phase of Newfoundland and Labrador’s offshore oil industry. The basin is in an area that has not been explored before, where the weather is harsh and the water is deep. However, the potential is massive — the Orphan Basin could hold more oil than the Jeanne D'Arc Basin on the Grand Banks, which is home to the Hibernia field, the Terra Nova field, as well as the White Rose and Hebron projects. However, some caution that it's too soon to know exactly what the Orphan Basin may hold. The Orphan Basin, which is just north of the Jeanne D'Arc Basin, sits on the edge of the continental self and in water 30 times deeper than on the Grand Banks. According to the Canadian Broadcasting Corporation, the Orphan Basin, however, poses more challenges that just deep water. The area's severe environmental conditions marked by high winds and cold water have prompted Chevron to bring in a drilling rig built for extremely harsh conditions. The massive Eirik Raude rig, one of the largest, toughest and most modern in the world, will sail to the Orphan Basin in a few weeks to drill the well. The project It will cost upwards of $44m to drill just one well. It will take Chevron and its partners four months to know if they find oil in the Orphan Basin, and whether it is commercial. The Orphan Basin first made news three years ago when a consortium of oil companies including Exxon Mobil, Imperial Oil and Chevron bid a record $591.5m for the right to explore it. (Source: Canadian Broadcasting Corporation)
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Transocean: Fleet Update Summary

Transocean Ltd. today issued a monthly fleet update summary which includes new contracts, changes to existing contracts, and changes in estimated planned out-of-service

Navantia Orders Sedni IAS for PEMEX Flotel

Sedni secures an important contract with Navantia to supply its Automation System (IAS) Diamar for the flotel vessel (BAP) which is being built at Ferrol factory for PEMEX owner.

MN 100: Tidewater Inc.

601 Poydras Street, Suite 1500 New Orleans, Louisiana 70130 Telephone: 504 568 1010 E-mail: corth@tdw.com Website: www.tdw.com Chairman and CEO: Jeff Platt Number of employees: 8,

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1730 sec (6 req/sec)