Helios Undergoes Major Refit at K&C

Tuesday, October 16, 2007
Knight & Carver YachtCenter’s Cliff Mayo (left), is shown aboard Helios with the megayacht’s chief engineer Per-Eric Kallstrom (center) and HF Interior managing director Curt Biller. (Photo Credit: John Freeman)

By the time Helios completes her six-month refit January 31, the 194 ft. Oceanco will be ready for her close-up. For now, the yacht’s once-classic European styling has been stripped away, to be replaced with a far more glamorous, sexy look. “It’s going to be a floating beach house, totally chic, edgy and contemporary,” said Captain Tommy Gurr. “The owners wanted something more fitting to their lifestyle. When it’s finished, I know they’ll feel at home here.” Launched in 2001, Helios now calls the Pacific its cruising base, one reason Gurr opted for a lengthy refit at San Diego’s Knight & Carver YachtCenter. “We really love San Diego,” said Gurr, a native of Great Britain. “It’s got so much going for it. The downtown’s vibrant, the concert scene is alive, and there’s the beach life and amazing weather. Everything’s here for us. I’d say San Diego covers all the bases for yachties.” As many as 100 full-time workers are assigned to the interior refit, implemented by HF Interior, a Swedish interior fabrication firm that specializes in cruise ship projects. Helios marks the company’s most extensive megayacht refit. Besides the major interior overhaul of the salon and all six staterooms, the refit includes full exterior paintwork as well as a full remodel of its 500 square foot sundeck, plus considerable system upgrades and maintenance. “This is our biggest project on what we’d term a smaller boat,” said HF Managing Director Curt Biller. “It requires a totally different time frame, with a stronger emphasis on precision and craftsmanship.” Knight & Carver’s Cliff Mayo, who serves as project manager with technical superintendent Howard Buller, views the Helios refit as an complex collection of smoothly moving parts. Dozens of staff tradesmen and subcontractors are working with HF’s craftsmen, some of whom have temporarily relocated from their native Sweden. The daily workforce includes carpenters, electricians, steelworkers, upholsterers, floor carpenters, mechanics and engineers, among other trades.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

Freighter Runs Aground in Lake Superior

The U.S. Coast Guard informs it is continuing to monitor and respond to the 833-foot U.S. cargo vessel Roger Blough, which ran aground Friday afternoon on Gros

China to "Pressure" U.S. on Maritime Issues

China will "pressure" the United States on maritime issues at talks in Beijing next week because of Chinese concern about an increased U.S. military presence in the disputed South China Sea,

Wedding Cruise Ship Runs Aground in Boston

The Boston Harbor Cruises' Majesty ran aground in Boston Harbor on Saturday. All 137 passengers were unharmed and transferred to the Asteria, another Boston Harbor Cruises vessel, according to the U.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0845 sec (12 req/sec)