Keel Laying Ceremony for CVN 77

Friday, September 05, 2003
Navy tradition dictates that each ship constructed for the Navy be honored by ceremonies on four historic occasions: keel laying, christening (or launching), commissioning, and decommissioning. George H. W. Bush (CVN 77) will be honored with the first of its historic occasions on Saturday, September 6, at Northrop Grumman Newport News Shipbuilding in Newport News, VA. The keel laying celebrates the laying of the first timber of a ship and can be traced back to the construction of early Navy ships. The present-day ceremony maintains the tradition, but has been modified because of updated materials, technology, and shipbuilding techniques. Following the ceremony, the former President Bush will initial a nameplate to authenticate the keel that will then be welded to it. President Bush will then announce, "the keel has been truly and fairly laid." Also participating in the ceremony will be Doro Bush Koch, the Ship's Sponsor and the daughter of former President Bush; the Honorable Hansford T. Johnson, Acting Secretary of the Navy; Admiral Vernon Clark, Chief of Naval Operations; the Honorable John Warner, U.S. Senator from Virginia; Tom Schievelbein, President, Northrop Grumman Newport News; and Admiral James L. Holloway III (ret.), Chairman of the Naval Historical Foundation. As the tenth and final Nimitz-class carrier, George H. W. Bush will stretch 1,092 feet, weigh 97,000 tons, and will be among the world's largest warships. Its top speed will exceed 30 knots and, with two nuclear reactors, it can operate for more than 20 years without refueling during its 50-year service life. The Navy awarded Northrop Grumman Newport News the CVN 77 construction contract in January 2001. A December 2002 ceremony marked the formal naming of CVN 77 after the former president and World War II Navy aviator. The carrier will be delivered in 2008 and join the fleet in 2009.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

MN 100: Twin Disc, Inc.

1328 Racine Street Racine, WI 53403 Telephone: 262 638 4000 Web: www.twindisc.com President and CEO: John H. Batten Number of employees: 990 The Company: Twin Disc designs,

China Orders More MAN Dual-Fuel Units

51/60DF engines to power LNGCs MAN Diesel & Turbo has announced a further order for its MAN 51/60DF engine. After a longer period of evaluation, an international consortium,

TORM Contracts Albwardy for Diving Services

Danish product tanker carrier TORM A/S and UAE-based Albwardy Marine Engineering (AME), an Albwardy-Damen JV, have signed a Service Level Agreement for diving services in the UAE region.

Navy

BAE Systems Awarded 'USS Hopper' Repair Contract

US Department of Defense informs BAE Systems Hawaii, Honolulu, Hawaii, is being awarded a not-to-exceed $22,905,907 undefinitized contract action to a previously

USNS Fall River Delivered by Austal USA

The Navy informs it has accepted delivery of Joint High Speed Vessel, the future 'USNS Fall River' from the Austal USA shipbuilder. The delivery marks a major milestone,

Navy Ocean Services Contracts Awarded to Five Firms

The US Department of Defense inform that five firms are to share in a broad range of ocean engineering services contracts with a combined maximum dollar value of US$99-million.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3546 sec (3 req/sec)