Keppel Delivers FPSO

Tuesday, February 28, 2006
Keppel Shipyard Ltd (Keppel Shipyard), a unit of Keppel Corporation Limited through Keppel Offshore & Marine Ltd (Keppel O&M), has delivered FPSO Capixaba, with a conversion contract value of over S$90 million.

The 13-month fast-track project is the sixth Floating Production Storage Offloading (FPSO/FSO) conversion project for Keppel Shipyard from Single Buoy Moorings (SBM), member of the SBM Offshore N.V. Group, since 2000.

The work scope on the former Stena Congress includes installation and integration of topside modules; the fabrication and installation of the internal turret, flare tower, piperack and helideck; and installation of a hose reel at the stern for offloading to export vessels.

FPSO Capixaba will now be capable of producing 100,000 barrels of oil per day (bopd) with a storage capacity of two million barrels. The vessel will be moored in 1,350 metres of water. First oil is anticipated in the second quarter of 2006.

To be leased by SBM to Petrobras SA, Brazil’s national oil company, FPSO Capixaba will be the first FPSO to be deployed in the Golfinho light oilfield in the Espirito Santo Basin offshore Brazil.

Three other FPSO facilities owned by SBM and converted by Keppel Shipyard are also on lease to Petrobras. They are FPSO Espadarte, FPSO Brasil and FPSO Marlim Sul. When the FPSO Capixaba joins their rank later in the year, their total production output for Petrobras will be 390,000 barrels of oil per day.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

U.S., India to Seal Nuclear Deal

The United States and India have reached a breakthrough on two issues holding up civil nuclear cooperation between them, U.S. President Barack Obama told a news conference in New Delhi on Sunday.

U.S. Refinery Workers' Contract Talks Moving Slowly

With just a week of bargaining left until the national contract for U.S. refinery workers expires, the United Steelworkers union (USW) said talks with oil company

MSC Sinfonia Upgradation at Fincantieri Shipyard

Extension operations on MSC Sinfonia, the second out of four MSC cruise ships to undergo the Renaissance Programme of enhancements, have begunin the past days at Fincantieri shipyard in Palermo.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1648 sec (6 req/sec)