Keppel’s DSS 51 Semi for Transocean

Tuesday, February 10, 2009
Lady Sponsor Mrs Lyn Thierens (third from right), spouse of Mr Harry Thierens (centre), Gulf of Mexico Drilling & Completions Wells Director of BP, is accompanied by (from left) Mr Rob Saltiel, Executive VP (Performance) of Transocean, Mr Teo Soon Hoe, Group Finance Director of Keppel Corporation, Guest-of-Honour Mr Peter Ong, Permanent Secretary of the Ministry of Trade and Industry, Mr Tong Chong Heong, CEO of Keppel O&M and Mr Choo Chiau Beng, CEO of Keppel Corporation.

Keppel FELS Limited has completed Transocean’s Development Driller III, an ultra-deepwater drilling rig built to Keppel’s proprietary DSS 51 semisubmersible (semi) design.

The Development Driller III is designed to construct wells as deep as 37,500 ft wells and operate in water depths of up to 7,500 ft, upgradable to 40,000 ft and 10,000 ft, respectively.

Designed by Keppel’s Deepwater Technology Group in collaboration with Marine Structures Consultants of the Netherlands, DSS units have a total payload of 13,500 tons. This heavy duty payload reduces the need and costs of transporting supplies to and from the rig considerably, and is especially valuable when operating in remote environments.

Rigs in the Series also have double-skin columns, which protect the critical equipment within from damage by external impact. This greatly reduces rig downtime in the case of hurricanes or strong climatic pressures out at sea. The layout of the engine rooms has also been designed to minimize the potential of both being shut-down at the same time in an emergency.

Furthermore, being able to operate at water depths of 9,842 ft and drilling depths of 32,808 ft below the mudline makes the DSS Series well-suited to operate in offshore Brazil, West Africa, Gulf of Mexico and Southeast Asia. The DSS Series also features reduced emissions and discharges.

Mr Robert L. Long, CEO of Transocean, said, “Through our collaborative effort with Keppel FELS, Development Driller III will soon be ready for deployment by our customer BP in the U.S. Gulf of Mexico.”

Development Driller III was named in the presence of Guest-of-Honour, Mr. Peter Ong, Permanent Secretary of the Ministry of Trade and Industry, by Mrs. Lyn Thierens, spouse of Mr. Harry Thierens, Gulf of Mexico Drilling & Completions Wells Director, BP.

Keppel FELS and Transocean have a long-standing partnership spanning several significant projects. These include the construction of Trident 20, the first international class jackup rig to be built in the Caspian Sea, upgrades and conversions of the Sedco 700-series semis to enable dynamic positioning, and the repair of various Transocean rigs.

Including Development Driller III, Keppel FELS has completed three of eight DSS Series semis ordered, since the design’s premiere in 2001.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

Offshore

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

IMO Adopts Polar Code Environmental Provisions

United Nations' International Maritime Organization (IMO) has adopted the environmental part of the Polar Code. Hereby, internationally binding regulations on

Two Hurt in Petrobras Platform Accident; Output Halted

Brazil's state-led oil company Petrobras was forced to stop output at its P-56 offshore oil production ship on Wednesday in the Marlim Sul field after an explosion

 
 
Maritime Security Maritime Standards Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1430 sec (7 req/sec)