Largest Aquastrada High Speed Ferry Under Construction at Rodriquez

Tuesday, January 16, 2001
Currently under construction at Rodriquez Cantieri Navali SpA's Pietra Ligure shipyard is a TMV 115 high-speed passenger and vehicle ferry for the Spanish ferry operator Balearia Eurolines Maritimes. The contract for this vessel was signed in January 2000 and delivery is expected in May 2001. Though very similar in size and capacity to the previous TMV 114 delivered to Spanish operator Armas Ocean Jet in April of this year, there are notable differences.

The reasons for these differences between the two vessels are due to owner preferences, including the choice of hull material. The additional truck lane meters of the TMV 115 have been obtained by using hoistable central and outboard car decks to allow for these taller vehicles. The car decks may be quickly hoisted upwards in a variety of configurations depending on loading requirements.

The maximum passenger and vehicle capacity of the TMV 115 is 210 cars and 884 passengers. Other details are outlined in the attached technical specification data sheet.

As with the majority of Rodriquez's Aquastrada Fast Ferries, TMV 115 will again incorporate a ride control system manufactured by Rodriquez Marine Systems, a wholly owned subsidiary of Rodriquez Cantieri Navali SpA. Based on almost five decades manufacturing foil systems, Rodriquez Marine Systems has a vast experience in the design and engineering of foil-based stabilization system.

Therefore, the TMV 115 includes T-Foils both fore and aft as well as four lateral fins for roll control. In addition, active Interceptor tabs are mounted on the transom with the added benefit of reducing roll and creating a hydrodynamic wedge thereby reducing resistance and increasing vessel speed. The entire system is centrally controlled by a single system that is optimized to provide the maximum passenger comfort under the most demanding sea conditions. A further benefit of the Rodriquez Marine System SMS (Seaworthy Management System) ride control system is the incorporation of small rudders into the T-Foil's vertical struts to provide directional control at full speed thereby maintaining maximum forward thrust from the waterjets. In addition to the ride control system for the TMV 115, Rodriquez Marine Systems is also supplying: Central vessel alarm and monitoring system; Start / stop / alarm / monitoring system for the propulsion equipment; Bow thrusters (tunnel and retractable type) and Hydraulic systems for all car decks and ramps.

Rodriquez is presently constructing 30 82 ft. (25-m) patrol boats for the Italian Coast Guard and a 213 ft. (65-m) yacht for a U.S.-based owner.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Drug Interception at Red Hook Container Terminal

Approximately 121 pounds of heroin and eight pounds of cocaine were discovered in a shipping container of vegetables that was moving from Ecuador to Miami, Fla.

Royal Caribbean's Revenue up 5.6%

Royal Caribbean Cruises Ltd reported a 5.6 percent rise in quarterly revenue, helped by higher passenger ticket revenue and onboard spending, sending the company's

ICS Criticises 'Prestige’ Judgement by Spanish Court

At a meeting of the International Oil Pollution Compensation Funds (IOPCF) this week, the International Chamber of Shipping (ICS) has strongly criticised the judgement

Shipbuilding

Symphony Sun’ Launched in Leer

On Friday the 29th of April, Nb. 420 was launched in Leer. She was christened ‘Symphony Sun’ and is the fourth vessel in a series of 6 that will be delivered to Symphony Shipping.

SCHOTTEL Debuts EcoPeller with High-torque Gears

Propulsion and steering systems manufacturer SCHOTTEL has unveiled its new EcoPeller (SRE), which it said offers improved efficiency and robustness. Playing a

Fincantieri Delivers Carnival Vista

Carnival Vista, the new flagship of the fleet of Carnival Cruise Line, brand of the Carnival Group, was delivered today at Fincantieri’s shipyard in Monfalcone.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0800 sec (13 req/sec)