Lukoil, Conocophillips’ YK Field Production Begins

Thursday, August 28, 2008
OAO LUKOIL President Vagit Alekperov and ConocoPhillips Chairman and CEO Jim Mulva today participated in a special ceremony on the occasion of the startup of the Yuzhno Khylchuyu (YK) field located in the Nenets Autonomous District.

One of the biggest fields in the north of the Timan Pechora oil and gas province, this field is developed by OOO Naryanmarneftegaz, a LUKOIL and ConocoPhillips joint venture (70% and 30%, respectively).
The field was discovered in 1981. Oil quality there surpasses the Russian Urals export blend quality: its density is 35.5 API (Urals, 32.0 API), and sulfur content is 0.71% (Urals, 1.3%).
The first stage comprises 32 development wells, an oil treatment unit, an oil desulfurization unit, a tank farm with the total volume of 40,000 m3, a power supply complex with the rated capacity of 125 MW, and other units.
Startup of the second stage of the YK field is scheduled for December 2008, at which time an additional 32 wells will be put into operation and a high-pressure compressor station and sulfur disposal and storage facilities will be completed.
The design oil production level in the field is expected to reach 7.5 million tons a year (more than 150,000 barrels per day) in 2009.
Oil produced at the field is transported by a 158-kilometer-long oil pipeline (530 mm in diameter) to the Varandey Oil Export Terminal located on the Barents Sea coast, with the capacity of 12 million tons per year, from where it is delivered, also through a floating storage facility in Kola Bay, by 70,000 ton deadweight tankers, for eventual sale to European and North American markets.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People in the News

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Greece Will Sell Piraeus Port Stake in Weeks

The Greek government will sell its majority stake in the port of Piraeus within weeks, the country's deputy prime minister told China's official Xinhua news agency,

 
 
Maritime Contracts Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1162 sec (9 req/sec)