Lukoil, Conocophillips’ YK Field Production Begins

Thursday, August 28, 2008
OAO LUKOIL President Vagit Alekperov and ConocoPhillips Chairman and CEO Jim Mulva today participated in a special ceremony on the occasion of the startup of the Yuzhno Khylchuyu (YK) field located in the Nenets Autonomous District.

One of the biggest fields in the north of the Timan Pechora oil and gas province, this field is developed by OOO Naryanmarneftegaz, a LUKOIL and ConocoPhillips joint venture (70% and 30%, respectively).
The field was discovered in 1981. Oil quality there surpasses the Russian Urals export blend quality: its density is 35.5 API (Urals, 32.0 API), and sulfur content is 0.71% (Urals, 1.3%).
The first stage comprises 32 development wells, an oil treatment unit, an oil desulfurization unit, a tank farm with the total volume of 40,000 m3, a power supply complex with the rated capacity of 125 MW, and other units.
Startup of the second stage of the YK field is scheduled for December 2008, at which time an additional 32 wells will be put into operation and a high-pressure compressor station and sulfur disposal and storage facilities will be completed.
The design oil production level in the field is expected to reach 7.5 million tons a year (more than 150,000 barrels per day) in 2009.
Oil produced at the field is transported by a 158-kilometer-long oil pipeline (530 mm in diameter) to the Varandey Oil Export Terminal located on the Barents Sea coast, with the capacity of 12 million tons per year, from where it is delivered, also through a floating storage facility in Kola Bay, by 70,000 ton deadweight tankers, for eventual sale to European and North American markets.

Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People in the News

More German Shipowners Look to Gibdock for Repairs

Gibdock remarks it has continued to see its stock rise amongst the German shipowner community over the past year. Indeed the Gibraltar ship repair yard’s recent

Wärtsilä Reshuffles Two Top Managers

The following appointments have been made in the management inform Wärtsilä Corporation: Mr Rakesh Sarin (59), B.Sc. (Eng.), has been appointed President of Power Plants,

Clarksons PLC Perform Strongly in 1H 2014

Leading shipping services group, Clarksons PLC reports strong strong financial performance in the first half of 2014. Financial Results Clarksons increased revenues by 25% to £111.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1164 sec (9 req/sec)