MODEC Awarded TLP for Anadarko Field

Tuesday, February 05, 2002
MODEC International LLC has entered into a letter of intent with El Paso Energy Partners, L.P. for the engineering, procurement and construction of the hull, mooring and production riser system for the world’s deepest tension leg platform (TLP). The TLP is expected to be owned by EPN and Cal Dive International, Inc. and is planned to serve as a production hub at Green Canyon 608 in the Gulf of Mexico initially for Anadarko Petroleum Corporation’s Marco Polo field discovery. The TLP is planned to be installed in 4,300 feet of water and is capable of supporting processing equipment designed to process 100,000 barrels of oil per day and 250 million cubic feet of natural gas per day. The facilities are scheduled to be online in 2004.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Technip Further Optimizes its Subsea Assets

Technip signed today an agreement to sell 100% of its North American diving assets to Ranger Offshore Inc.(1). Technip’s strategy focuses on high technology

InterMoor UK Completes 2,300 Accident-free Projects

InterMoor UK Operations, part of Acteon’s foundations and moorings business, says it has completed seven years and more than 2,300 projects without a single lost-time incident (LTI).

Navy Ocean Services Contracts Awarded to Five Firms

The US Department of Defense inform that five firms are to share in a broad range of ocean engineering services contracts with a combined maximum dollar value of US$99-million.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1057 sec (9 req/sec)