NASSCO Delivers USNS Amelia Earhart

Monday, November 03, 2008

NASSCO Delivers USNS Amelia Earhart

General Dynamics NASSCO, a wholly owned subsidiary of General Dynamics (NYSE: GD), delivered USNS Amelia Earhart (T-AKE 6) to the U.S. Navy on October 30. The ship is named in honor of the record-setting aviator.

“We have reduced the man-hours to build this sixth ship of the T-AKE class by nearly 50 percent when compared to the production time of the lead ship,” said Frederick J. Harris, president of General Dynamics NASSCO.

Construction of the USNS Amelia Earhart began in December 2006. NASSCO has incorporated international marine technologies and commercial ship-design features into T-AKE class ships, including an integrated electric-drive propulsion system, to minimize operating costs during their projected 40-year service life. With a cargo capacity of more than 10,000 tons, the primary mission of T-AKE ships is to deliver food, ammunition, fuel and other provisions from shore stations to combat ships at sea.

NASSCO has delivered the first five ships of the T-AKE class and has construction contracts for five additional ships, including the Amelia Earhart. The Navy has options to build four additional T-AKE ships for a total of 14 vessels. The seventh through tenth ships of the T-AKE class are currently under construction at NASSCO and are scheduled for deliveries through the third quarter of 2010.

General Dynamics NASSCO employs more than 4,800 people and is the only major ship construction yard on the West Coast of the United States. The San Diego shipyard is also building the first three of nine product carriers for U.S. Shipping Partners L.P.

(www.nassco.com)

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Newport News, ODU Partner for Bachelor's Degree Program

Huntington Ingalls Industries (HII) announced today that apprentices at Newport News Shipbuilding will now have the opportunity to earn a bachelor of science degree

Azeri Shipyard, BP Sign Vessel Construction Contract

Azeri state energy company SOCAR's shipyard and British oil major BP have signed a $378 million deal to design and build a subsea construction vessel for the Shah Deniz II gas project,

Fishing Vessels Fit with Wärtsilä’s NOx Reducer

Wärtsilä said its new NOx Reducer will be fitted to two new fishing vessels under construction at the Celiktrans yard in Turkey. The ships are owned by HB Grandi,

Navy

US Navy Completes Korea Ferry SAR Mission

With concurrence from South Korean commanders, the U.S. Navy amphibious assault ship USS Bonhomme Richard (LHD 6) is departing waters around Jindo, South Korea

Today in U.S. Naval History: April 23

Today in U.S. Naval History: April 23 1917 - Launching of USS New Mexico, first dreadnought with turboelectric drive 1918 - USS Stewart destroys German submarine off France 1945 - In only U.

CNR: Innovation Maintains US Naval Advantages

An interview with Rear Adm. Matt Klunder, U.S. Navy Chief of Naval Research What are your near term, mid-term and long term science and technology (S&T) objectives?

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1078 sec (9 req/sec)