NASSCO Lays Keel for BP Tanker

Wednesday, April 20, 2005
National Steel and Shipbuilding Company (NASSCO) held a keel-laying ceremony for Hull 487, the fourth ship of the Alaska Class double-hull oil tankers being constructed for BP Oil Shipping Company, USA. BP’s Site Team Member John Penso welded his initials into the keel to signify the start of structural erection.

"These double-hull tankers are providing BP with the best available propulsion, ship, and environmental control technologies to protect US waters," said Richard Vortmann, president of NASSCO. Vortmann added that the design of the 1.3-million-barrel-capacity tankers in the Alaska Class will allow maximum flexibility for oil deliveries to West Coast ports, including BP refineries in Los Angeles, CA, and Cherry Point, WA.

"The BP tanker contracts have created hundreds of jobs for NASSCO and are contributing millions of dollars in payroll, tax revenues and purchases from local suppliers each year during the life of the contract, which will run through 2006," added Vortmann. "We are continuing to hire people to fill hundreds of positions that remain available for this and other shipbuilding programs in our 10-ship backlog."

The first ship in the class, the Alaskan Frontier, was delivered in August 2004 and the second ship, the Alaskan Explorer, was delivered in March 2005. On April 10, the third ship was floated out of NASSCO’s graving dock following structural erection and is being completed pierside at the NASSCO shipyard. The third ship will be delivered later this year and the fourth ship in 2006.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

China Unveils Action Plan on Maritime Silk Road

China has unveiled the principles, framework, and cooperation priorities and mechanisms in its Maritime Silk Road initiative in a bid to enhance regional connectivity

JV Wins $2bln Freeport LNG Contract in US

A joint venture (JV) between CB&I, Chiyoda International and Zachry Industrial has won a contract worth over $2bn from FLNG Liquefaction 3 for a liquefied natural

Feds Delay LNG’s Port Ambrose Application

The US Coast Guard and the US Maritime Administration (MARAD) have temporarily suspended their review of the proposed Port Ambrose deep-water LNG import terminal.

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1396 sec (7 req/sec)