NCL Halves Cruise Ship Order

Tuesday, December 23, 2008

According to a Reuters report, Star Cruises unit Norwegian Cruise Line (NCL) has cancelled its order for a second F3 cruise ship from shipbuilding group STX Europe, but will move ahead with the first order, STX said on Dec. 18. This 150,000 ton F3 cruise ship, which will be built by STX Europe's French shipyard, will carry a total of 4,200 passenger. Delivery is expected in late May 2010, as originally scheduled.

(Source: Reuters)

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

MN 100: BAE Systems Ship Repair

750 W. Berkley Avenue Norfolk, VA 23523 Tel: (757) 494-4674  Email: john.measell@baesystems.com Website: www.baesystems.com/shiprepair President: William Clifford The Company: BAE Systems,

Keppel Delivers 4th Jackup Rig to Qatar

Keppel FELS Limited (Keppel FELS) has delivered its fourth jackup rig, "Dukhan", to Gulf Drilling International Ltd. q.s.c. (GDI) of Qatar nine days ahead of schedule,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2521 sec (4 req/sec)