New Debis Clearing Vessel Design

Tuesday, September 21, 2004
Alan C. McClure Associates (ACMA) completed its contract from the Guadalupe-Blanco River Authority (GBRA) to design and supervise the construction of a 32-ft. barge that will remove debris from the Blanco and Guadalupe rivers and their tributaries as they flow through south and southeast Texas.

After establishing the capabilities that would be required to operate in this specialized environment, ACMA developed the conceptual design, recommended equipment and propulsion systems, developed bid specifications, distributed specifications to shipyards for bids, evaluated bid packages, oversaw construction and provided owner’s representation throughout the project. “Although this was basically a ‘soup to nuts’ assignment,” said ACMA President, Scott McClure, “I’m not aware of any other vessel quite like this one. Of course, the ACMA team always enjoys a new and challenging assignment and given our extensive analytical and shipyard experience, this is exactly the kind of assignment we specialize in.”

Dubbed MISS GUADALUPE II, the GBRA’s newest vessel meets the challenge of operating in very shallow water, while still maintaining its ability to fit under low-level bridges along the waterways. To accommodate a drive-on frontloader that’s positioned on the deck to remove different types of debris from the rivers, the craft’s beam has been specifically designed to create a very stable environment. And, with its Thrustmaster hydraulic thrusters, the vessel is highly maneuverable. This innovative vessel also has the advantage of being small enough to be truckable to any number of marine locations.

The MISS GUADALUPE II was fabricated and constructed at Bollinger Houston L.L.C., a subsidiary of Bollinger Shipyards, Inc. “This was a great project for our Houston yard,” said Robert Socha, executive vice president marketing and sales of Bollinger. “The facility is noted for its inland and offshore vessel services and this project provided the industry with another example of our Houston yard’s many marine talents.”

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

BAE Systems to Expand San Diego Shipyard

BAE Systems announced it will invest approximately $100 million to expand drydocking capabilities at its San Diego shipyard.   The investment, which will include

 
 
Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0992 sec (10 req/sec)