New Navy Contract

Thursday, October 22, 2009

General Dynamics Bath Iron Works, Bath, Maine, is being awarded a $79,452,144 modification to previously awarded contract (N00024-06-C-2303) to exercise an option for additional class services associated with the detail design and construction of the DDG 1000 Zumwalt Class destroyer.  This work will provide technical and industrial engineering in the interpretation and application of the detailed design to support construction and the maintenance of a safe and operable ship design.  Work will be performed in Bath, Maine, and is expected to be completed by November 2010.  Contract funds will not expire at the end of the current fiscal year.  The Naval Sea Systems Command, Washington, D.C., is the contracting activity.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ezra Bags $70m in Offshore Contracts

Ezra Holdings Limited, a leading contractor and provider of integrated offshore solutions to the oil and gas industry, today announced that the Group’s Subsea Services division,

Clean Marine Wins New Contract

Clean Marine has been selected by Hyundai Mipo Dockyard in South Korea to supply exhaust gas cleaning systems (EGCS) for two new MR tankers. IMO’s convention

Liebherr to Deliver RTGs to Mayotte and Manila

Liebherr confirms orders for variable speed RTGs and electric RTGs. DPWorld Asian Terminals Inc. has placed an order with Liebherr Container Cranes for a further 5 RTGs at its Manila facility.

Navy

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

US Navy CNO: Photo of the Day

Chief of Naval Operations (CNO) Adm. Jonathan Greenert receives a system update brief in the combat information center aboard the Arleigh Burke-class guided-missile

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1394 sec (7 req/sec)